An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAKORTRIWULAN IV 2013 PT PLN (Persero) Sektor Pengendalian Pembangkitan Bukittinggi TARAHAN 8-10 Januari 2014

  2. Latar Belakang Road Map SBKT 2012-2018 MENJADI PERUSAHAAN PEMBANGKIT TERKEMUKA DAN UNGGUL DI INDONESIA DENGAN KINERJA KELAS DUNIA

  3. Content • Peningkatan Pengendalian Pro-Bis 2

  4. PENGENDALIAN O/M (OPERATIONAL & MAINTENANCE) PLTA KONDISI SEKARANG (S/D 2013) • OPERATIONAL : (outsourcing) • Ops Alat bantu • Ops Pintu Air • Cleaning service/Area • Jasa Pengamanan • Jasa Pengemudi • MAINTENANCE : (outsourcing) • pemeliharaan alat bantu : • Pompa minyak tekan • Pompa minyak pelumas • Sistem udara tekan • Sistem Dewatering • Sistem Excitasi 2013 :PJTK 2014 : PP No. 19 /2012  (SLA) KEMUNGKINAN KEGIATAN O/M PLTA BATANG AGAM DI ALIH DAYAKAN SECARA KESELURUAN

  5. RENCANA ALIH DAYA O/M PLTA BATANG AGAM • OPERATION & MAINTENANCE POWER PLANT: • O/M Turbin dan Generator • O/M Alat Bantu • O/M Listrik dan Control • OPERATION & MAINTENANCE WATER WAY: • O/M Intake Weir • O/M Kolam Pasir • O/M Kolam Tando • O/M Kolam Tail Race • DAN • CLEANNING SERVICE / AREA

  6. Content • Implementasi e-LogSheet SBKT 5

  7. IMPLEMENTASI e-LOGSHEET • Tahapan Implementasi E-log Sheet : • Sosialisasi / pengenalan • Membangun Infrastruktur : • Pembangunan Jaringan/LAN • Software (dari Sektor Jambi) • Pengadaan Infrastruktur (Server , TAB, PC Control Room) • Uji Coba e-Logsheet

  8. WORK PLAN IMPLEMENTASI e-LOGSHEET

  9. Content

  10. e- EMI SURVEY SBKT 2013 • Periode pelaksanaan 27 Sept-4 Okt 2013 • Jumlah total respondent 96 Pegawai (± 90 %-dari112) RESULT

  11. Technical system Management Infrastructure Mindsets, capabilities and Leadership QUICKWIN 2013 Workshop KPI Cascade Normalisasi Slipring PLTA Singkarak Media OPI (WarkOPI) Bintang Pagi Tea Morning

  12. Technical system Management Infrastructure Mindsets, capabilities and Leadership RENCANA QUICKWIN 2014 e - LOGSHEET Penambahan Jaring Trush Boom PLTA Singkarak Go live SMT Manajer Berkantor Sehari di PL Kotak Saran dari Peg->Manajemen

  13. Content • 5 R SBKT

  14. GALERY 5R SBKT SEBELUM SESUDAH

  15. GALERY 5R SBKT SEBELUM SESUDAH

  16. RUANG INTEGRITAS KANTOR SEKTOR LANTAI 1 LANTAI 2

  17. VISUAL MANAGEMENT LANTAI 1 LANTAI 2

  18. Content • REMOTISASI PLTA BATANG AGAM 18

  19. REMOTISASI PLTA BATANG AGAM • Tahapan : • Pengajuan Kajian Teknik √ • Pengajuan RAB √ • Pemilihan Alternatif PLC/DCS • Proses Pengadaan • Pelaksanaan Progress s/d saat ini : Pengkajian pemilihan alternatif antara sistem PLC atau DCS

  20. TERIMA KASIH

  21. IMPLEMENTASI IMAP • Tahapan Implementasi IMAP: • Sosialisasi / pengenalan IMAP • Rencana Workshop: training pegawai SBKT • Penunjukan Tim IMAP • Persiapan Implementasi  Implementasi