This workshop presentation provides an update on the status of the Readout Components, FEE for STAR, Firmware, Power Supply & Distribution, as well as a summary and outlook for the installation in 2018.

ivanr
Download Presentation

Status Readout

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Readout Jochen Frühauf, GSI STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut September, 2018

  2. @ Outline • CBM ToF @ STAR • Readout Components • Status FEE for STAR • Firmware Status • implemented • open issues • Power Supply & Distribution • Summary and Outlook installation in 2018 Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  3. @ CBM ToF @ STAR fixed target pos. (~500 cm) • 12 sectors • 36 modules • 108 MRPCs • 6912 channels • 637 electronic cards Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  4. @ Readout Components • PADI: Preamplifier board 32 CH • Feed through PCB • GET4: TDC board 32 CH • Backplane with GBTx chip • AFCK: FPGA board • FLIB: FPGA PCI express card CBM TOF module TCA crate HP-PC Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  5. @ Status FEE for STAR • 216 x PADI FEE • production finished • Yield 99% (ASIC Level 12 Chips reworked ) • all PCBs are mounted • 72 x Feed Through PCB • production finished • all PCBs are mounted • 216 x GET4 FEE • production finished • Yield 97% • reworked 71 ASICs test ongoing • most of the PCBs are mounted • 72x GBTx Readout Board for ToF • 99 PCBs produced • SCA Chip not working so far • not all PCBs tested yet • a few non working PCBs found • 8 out of 42 tested ~20% • 24 PCBs are mounted • 9x CLK Distribution are available • 1x CLOSY is available • 1x STAR Interface is available • 12x AFCKs are available + Addons • 2 x FLIBs are available + Addon Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  6. @ Firmware Status • Implemented: • readout of 6 GBTx(1 Sector) • Real Microslices • data pre-processing • merging Epochs of up to 240 GET4s • Token detection • specific Data handling for some unexpected GET4 behavior • lost Epoch • multiple of the same Epoch Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  7. @ Firmware Status RMS Plot for Pulser Input • open issues: • we see from time to time “Mismatch Errors” which indicates not all GET4 send the right Timestamp • further debugging needed • GET4 FEE runs on recovered CLK from GBTx instead of 160MHz from CLOSY • loss in precision • we do not always get a link between GET4 and GBTx in case of copper clk • further debugging needed • detailed information about CLK in separate PPT available ~55ps between GET4 between 2 GBTx different AFCK ~35ps between GET4 between 2 GBTx same AFCK ~30ps between GET4 served by 1 GBTx System resolution should be still below 80ps Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  8. @ Power Supply • Mean Well Power Unit • 2x 12V / 80A (2x 110V / 13A) needed for full wheel • can STAR provide 2 x power cord with IEC320-C20 connector • controlled by web interface so far • Power Distribution Unit for STAR will be produced in 2nd week of October • prototype @ mCBM already controlled via epics via raspberry pi 3 Mean Well RKP-1UI-CMU1 RCP-2000-12 EPICs GUI Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  9. @ Summary & Outlook • we produced our FEE for STAR in China • we implemented the GBTxin our Readout Chain • we will install the full wheel @ STAR November / December 2018 • we plan to remove JTAG-PC inside the Cave • either we use the raspberry or an USB to Optic converter (already bought) • we continue debugging issues in our Firmware and Hardware Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  10. Thank you for your attention Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  11. Backup Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  12. CBM ToF Readout Scheme for mCBM& STAR (reminder) 7 1 MRPC PC 4 5 2 • Detector = MRPC • Preamplifier & Discriminator = PADI • Time to Digital Converter (TDC) = GET4 • GBTx = Data Concentrator ASIC from CERN = 1nd concentrator stage • Data Processing Board = 2rd concentrator stage (AFCK in MTCA Crate) • Clock Master (CLOSY) & Clock Distribution for ToF • PC = storage Device with FLIB (PCIe Card) 3 50m 5-20m PADI TDC GBTx DPB FLIB STAR Trigger - Information CBM CLK (40MHz) ToF Clock Master ToF CLK (160MHz) Cu optical 6 STAR CLK (40MHz) Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  13. Clock and Token Detection & Signal Distribution outside the Magnet 16x 50MHz + Reset 16x TOKEN 16x 40MHz + SYNC 1x for 1 Sector (Standalone or mTCA) 12x for full installation (mTCA) CNTR Link only 1x for full System Distribution Boards RJ45 (LVDS) 40MHz & SYNC 1x CNTR to eTOF TOKEN 50MHz & Reset 1x FLIB to DAQ Room up to 6 GBTx / AFCK to eTOF CLOSY CNTR Link provides: RESET for FEE external Pulser Signal cntr signal for switch for external Pulser injection • STAR Interface PCB provides : • Signal conversion into LVDS • Signal Splitting • Power for: • 3x Distribution Board • 1x CLOSY STAR 40MHz STAR_IF CBM 40MHz CBM 160MHz SYNC differential LEMO (LVDS) differential LEMO Connector Flatband Cable (Token) Connector RJ45 Connector TOKEN / 50 MHz STAR 40MHz / RES 1x 160MHz & SYNC to eTOF PECL & LVPECL Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  14. Clock / SYNC & CNTR Distribution inside the Magnet to neighbor Sector 1x CNTR 1x 160MHz & SYNC from downstairs 1x SECTOR Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  15. @ CBM ToF @ STAR Module testing in HD ongoing • 4 sectors under test • 2 sectors only under GAS Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

  16. CBM ToF @ mCBM • readout 1600 Channel Jochen Frühauf--STAR-CBM Joint Workshop--September 2018