100 likes | 121 Views
Regional Planning Meetings 2005. Planning and Engineering Overview Presented by Vivek Khanna , Airport Engineer. Airport Information Management System. Online at http://www.aeronautics.ok.gov. Features Airport Guide Capital Improvement Program Administrative Codes
E N D
Regional Planning Meetings 2005 Planning and Engineering Overview Presented by Vivek Khanna, Airport Engineer
Airport Information Management System Online at http://www.aeronautics.ok.gov Features • Airport Guide • Capital Improvement Program • Administrative Codes • Airport Development Worksheets • Pavement Management • System Plan • Consultants contact list
Pavement Management Program • 33% of pavement requiring only routine maintenance • 67% of pavement requiring more significant rehabilitation • As time passes more pavement will require significant rehabilitation 2005 2010 Inventory Data for 81 Oklahoma Airports
Airport Information • Construction history • Pavement type • Pavement thickness • General geotechnical information • Pavement Condition
$1.00 Rehab here 40% Drop In Quality 75 % of Pavement Life $4.00 to $5.00 here 40% Drop In Quality 12 % of Pavement Life Cost-Effective Pavement Maintenance Pavement Condition Pavement Age
Airport Development WorksheetsOn-line at: http://www.aeronautics.ok.gov • Goal: Present a Long-range development plan • Include allUNCONSTRAINED AIP ELIGIBLEneeds • Planning-Level Estimates • Compatible with FAA • Framework: • Airport Deficiencies • Short term – 0 to 5 yr • NPE • CIPs – Airport, OAC • 6-10 and 11 -20 year needs • The first step in a disciplined Capital Plan!
ADWS Updates • Two-year cycle • 75 sponsors responded • Cover letter of Interest • Signed by Sponsor‘s authorized representative • Project Data-sheet • Identify the ODO and project scope • Justify project • Project sketch • Planning cost-estimate
FAA’s NPIAS Needs Update 2005 • FAA will use Commission’s 0-5yr ADWS database • Update the NPIAS needs • Electronically upload the 0-5yr ADWS into FAA’s database • Reported to Congress • 20% of total 0-5yr ADWS - annual NPE • Important not to under identify airport’s needs!
Typical Projects • Pavement Maintenance • Navigational aids • AWOS • Land acquisition • Pavement rehabilitation, widening or extension • Efficient Drainage • Action Plans and ALPs