Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects. James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting TRB ACD40 Williamsburg, VA. Study Results Summarized. I-80 Davis OGAC – 8 years State Route 138, Los Angeles County – 3+ years
E N D
Update on Results of Long-term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting TRB ACD40 Williamsburg, VA
Study Results Summarized • I-80 Davis OGAC – 8 years • State Route 138, Los Angeles County – 3+ years • ADOT Pilot Studies – 2+ years
I-80 Pavement Project Location: I-80 just east of Davis and west of Sacramento, CA Traffic: 1998 - 120,000 ADT (almost 10% trucks) 2004 - 135,000 ADT • Existing - Aged AC surfacing • DGAC (60mm) applied in June 1998 • OGAC (25 mm) applied in July 1998
Frequency Spectra – 20m Baseline 7 Year
Frequency Spectra – 145m DOWNWIND Baseline 8 Year UPWIND 8 Year Baseline
LA 138 Pavement Research • Research Site est. 2002 • Two Measurement Techniques • Statistical Passby • Onboard Tire/Pavement Sound Intensity • 5 Pavements types • DGAC • Thick OGAC (75mm) • Thin OGAC (30mm) • RAC • BWC
LA 138 Results • Initial results documented by Volpe and Caltrans (Illingworth & Rodkin) • Initial levels up to 4 dBA lower than DGAC with Thick OGAC and RAC quietest • Regular testing of Tire/pavement sound intensity – spring and fall
LA 138 Results SI Level – Eastbound SR 138
Results of the Arizona Quiet Pavement Program – Sites 3D and 3E
Site 3D – AZ Route 202 Random Transverse Tined PCC ARFC
Site 3D Measurements 50ft x 12ft & 5ft 250ft x 5ft 100ft x 5ft
Site 3E – AZ Route 101 Uniform Transverse Tined PCC ARFC
Site 3E – Measurements 50ft x 12ft & 5ft 100ft x 5ft 100ft x 5ft
Site 3D Measurements 50ft x 12ft & 5ft 250ft x 5ft 100ft x 5ft
I-280 San Mateo • Existing PCC surface • PCC and Rubberized Open Grade • Onboard Tire/Pavement Sound Intensity
Results for I-280 after 3 yrs RAC (O)