When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house. Facing brick being built. Quoin stones and DPC. DPC in position. DPC between wall and floor. Blocks ready for internal walls. Wall ties in position.
E N D
When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house
Preparing scaffolding for the next level of bricklaying. Toe plates and bracing still need to be added