Report on international standards work. NEFTEGAZSTANDARD 2013 Nizhny Novgorod October 2013 Alf Reidar Johansen OGP Standards Manager. Content. OGP Interim Solution Backup slides New ISO/OGP industry proposal Status OGP/API TF on long term solution Other OGP work.

jena
Download Presentation

Report on international standards work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report on international standards work NEFTEGAZSTANDARD 2013Nizhny Novgorod October 2013 Alf Reidar Johansen OGP Standards Manager

  2. Content • OGP Interim Solution • Backup slides • New ISO/OGP industry proposal • Status OGP/API TF on long term solution • Other OGP work

  3. OGP Interim Solution compared to ISO route (simplified) Trade regulation «barrier». Draft standards text and comments will be available in the public domain . Review and approval by OGP PM & Sponsor

  4. Next phase • OGP Continues to offer a safe platform for drafting international standards to be balloted and published by ISO. • OGP and ISO management had a very good meeting in August. • The Industry Solution describedhereinwasproposed by ISO Central Secretariat, building on ISO Directives and OGP’srole as a liaison member to ISO/TC67.

  5. New OGP solution vs ISO route (draft & simplified) Project initiation1) 3) 2) 4) Trade regulation «barrier». Draft standards and comments will be made available in the public domain. Review for controlled technology (TBA) Note 1: Project initiation may take place by OGP only. Note 2: Non-OGP members will be invited Note 3: May go to FDIS or publication. Note 4: API material (TBD) may not be used

  6. OGP proposed ISO/TC67 resolution • ISO/TC67 welcomes the offer from OGP as a liaison (A) member to continue its assistance in developing draft ISO standards in a protected environment and recommends its members to use this solution, where the SCs/WGs find it relevant. • ISO/TC67 requests its secretariat to co-operate with OGP in such an arrangement. ISO/TC67 agreed to these resolution in their plenary meeting in Oslo, September 2013.

  7. Joint OGP/API TF long term solution Establishement • Joint Task Force (TF) established by OGP and API management August 2012 • Purpose: Determine a process for the continued development of globally accepted international standards for the oil and gas industry, given the current US and EU trade sanctions. • TF membership (15 members): • Six members from API, six from OGP members • Added two lawyers, one facilitator • Staff one each from OGP and API • Steering Committee (6 members)

  8. Joint OGP/API TF long term solution Terms of References • Need for a single set of industry standards to avoid duplication, with the potential for more than one brand, • Need for the standards to be globally acceptable and widely used, • Need for the standards to be accepted by the regulatory community, • A standards setting process as the foundation for the single set of industry standards that builds on the existing API/OGP infrastructure and allows for increased international participation, and • Need to ensure a legally compliant process.

  9. Current status • From 8 options to one pragmatic (draft) solution that provides a process to legally publish standards using either an API or OGP/ISO process path • TF will develop governance (front-end process) to ensure coordination between stakeholders to avoid duplication and have the largest possible audience among the global expert community • TF awaits the OFAC response to provide the final framework of the proposed solution

  10. Other OGP work • OGP-IPIECA Good Practice Guidelines for Development of Shale Oil and Gas for European operations in final stages of approval for publication. • Wells Expert Committee active on: • BOP reliability - being investigated • Well Control Incidents Database - alerts • Human Factors - Training, Competency & Behaviour guidelines • Standards prioritized - OGP Report 485 to be re-issued these days

  11. OGP Contacts OGP Reception • Reception@ogp.org.uk • Tel: +44 207 633 0272 Alf Reidar Johansen (Standards manager) • Alf.Reidar.Johansen@ogp.org.uk • Mobile: +47 95 029 079 Jarno Dakhorst (Manager for New Solution) • Jarno.Dakhorst@ogp.org.uk • Mobile: +31 6 33 33 46 71