Suisun Valley School K-8 2013 Classroom Addition Project

Suisun Valley School K-8 2013 Classroom Addition Project. Suisun Valley K-8 Classroom Addition Summary . SITE MODIFICATION FEATURES 7 New classrooms centered around ‘courtyard’ spaces 3 New r estrooms (Boys, Girls, Staff)

jennis
Download Presentation

Suisun Valley School K-8 2013 Classroom Addition Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Suisun Valley School K-8 2013 Classroom Addition Project

  2. Suisun Valley K-8 Classroom Addition Summary SITE MODIFICATION FEATURES 7 New classrooms centered around ‘courtyard’ spaces 3 New restrooms (Boys, Girls, Staff) 4 Existing portables relocated to accommodate a ‘finger plan’ design for better visibility New stamped concrete surface with tree planter boxes Revised parking lot New grass turf athletic field located behind the multi-use building New fenced Kindergarten playground area

  3. Suisun Valley K-8New Classrooms NEW BUILDING FEATURES Cool roofs for energy efficiency Abundant natural lighting (windows) Solar tube skylights for additional natural lighting Front and rear classroom exits Buildings set at grade- no ramps Roof overhangs for rain Central layout to allow better collaboration between classes

  4. Enlarged Site Plan

  5. Aerial View from North West

  6. Aerial View from South West

  7. View from South East

  8. View from East