130 likes | 152 Views
Implementing a non-seasonal greywater system on the South Co-Op roof in Corvallis, OR to meet city and state requirements. Collecting rainwater and filtering it for reuse, with detailed plans and acknowledgements for successful installation.
E N D
Team Greywater • Brittany Park • Dennis Petersen • Jon Isaacs
Objectives • Design and Install non-seasonal Greywater System at the South Co-Op • Meet all City and State Requirements
Water Source Water Sink
The Outside Wall: Greywater System Location
Rain Water Collection Co-Op Roof 6’ Total Roof Area = 1022 ft2 36’ 27.75’ Average Rainfall in Corvallis, OR Average Rainwater Volume per Month
Future Work 2’ To Filter From Sinks 5’ 1’ To Toilet 1’
Permitting Greywater System Rainwater Tank • Final Piping Plans • Specifications of BRAC System • Manufacturer’s Installation Instructions • Final Piping Plans • Specifications of Rainwater Tank
Acknowledgements • Dave Eckert (Project Sponsor) • Dr. Harding (Senior Capstone Professor) • Jason Blake-Beach (Co-Op Manager) • Peter Byrne (BRAC Dealer) • Paul Cooke (Plumber) • David Hensley (Corvallis Plumbing Inspector)