Radiation Protection aspects LSS1 - TAN region

Radiation Protection aspects LSS1 - TAN region. Cristina Adorisio (CERN - DGS/RP). Outline. Residual dose rate measurements Last TS (June 25 th , 2012) Evolution of activation Prediction for Xmas technical stop and LS1 Work-Dose Plan LHCf reinstallation during Xmas technical stop

joel-herman
Download Presentation

Radiation Protection aspects LSS1 - TAN region

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Radiation Protection aspectsLSS1 - TAN region Cristina Adorisio(CERN - DGS/RP)

  2. Outline • Residual dose rate measurements • Last TS (June 25th, 2012) • Evolution of activation • Prediction for Xmas technical stop and LS1 • Work-Dose Plan • LHCf reinstallation during Xmas technical stop • ATLAS ZDC reinstallation during Xmas technical stop • AFP installation region estimation • TCL5 collimator activation • Conclusions LTEX Meeting, September 13th - 2012

  3. Thanks to: A. Herve (CERN DGS/RP) TAN- LSS1L RP measurements done on June 25th 2012 All values at contact TOP 4 : 12µSV/h SIDE 3 : 38µSv/h TOP 5 : 12µSv/h SIDE 1 (côté tunnel):10µSv/h TOP 3 :10µSv/h TOP 6 : 16 µSV/h TOP 1 : 27µSV/h TOP 7 : 44µSv/h SIDE 1 9µSV/h TOP 2 : 5µSv/h SIDE 2 : 16µSv/h SIDE 3 : 39 µSv/h

  4. Thanks to: A. Herve (CERN DGS/RP) TAN- LSS1R RP measurements done on June 25th 2012 All values at contact SIDE 3 : 35 µSv/h SIDE 1 : 11 µSv/h (*) TOP 4 12µSv/h TOP 5 10µSv/h TOP 3 : 8µSv/h TOP 6 15µSv/h TOP 2 : 9µSv/h TOP 7 27µSv/h TOP 1 : 77µSv/h SIDE 2 : 16µSv/h (*)

  5. Thanks to: A. Herve (CERN DGS/RP) TAN- LSS5L RP measurements done on June 25th 2012 All values at contact SIDE 1: 13µSv/h TOP 4: 24µSv/h SIDE 3: 54µSv/h TOP 5: 20µSv/h TOP 3: 28µSv/h TOP 2: 18µSv/h TOP 6: 26µSv/h TOP 1: 63µSv/h TOP 7: 50µSv/h SIDE 2: 14µSv/h

  6. Thanks to: A. Herve (CERN DGS/RP) TAN- LSS5R RP measurements done on June 25th 2012 All values at contact SIDE 3: 95µSv/h SIDE 1: 13µSv/h (*) TOP 4: 22µSv/h TOP 5: 30µSv/h TOP 3: 22µSv/h TOP 6: 30µSv/h TOP 2: 19µSv/h TOP 7: 50µSv/h TOP 1: 48µSv/h SIDE 2(*): 16µSv/h

  7. TS#2 Survey measurementsSummary Residual dose rate on contact (mSv/h) LTEX Meeting, September 13th - 2012

  8. Evolution of activation • The measurements could be used to estimate the residual dose rate during the TS in 2012 and the LS1 • Referring to June 2012 detailed measurements done on TANs, the scaling factors is: • 1.35 for Xmas TS 2012 → essentially driven by the peak luminosity • Referring to Feb. 2012 detailed measurements done on TANs and on the detectors, the scaling factors is: • 3 for LS1 → essentially driven by the integrated luminosity LTEX Meeting, September 13th - 2012 measurements extrapolations

  9. LHCf re-installation – Xmas TS 1 week cooling time LTEX Meeting, September 13th - 2012

  10. LHCf re-installation – Xmas TS 1 week cooling time LTEX Meeting, September 13th - 2012

  11. LHCf re-installation – Xmas TS Summarizing (1 week cooling time): 1 week cooling time LTEX Meeting, September 13th - 2012 • The estimated dose are done considering the maximum dose rate at the position of the worker (TAN aisle, TAN top or side on contact). • The individual dose for two of the LHCf physicists falls into the ALARA level II. • Collective dose falls into ALARA level II.

  12. Evolution of activation • No MD before the Xmas TS • No MD also before TS#3 → relook at the estimations after the next TS LTEX Meeting, September 13th - 2012 measurements extrapolations

  13. LHCf re-installation – Xmas TS Summarizing (1 DAY cooling time): 1 DAY cooling time LTEX Meeting, September 13th - 2012 • The estimated dose are done considering the maximum dose rate at the position of the worker (TAN aisle, TAN top or side on contact). • The individual dose for the LHCf physicists falls into the ALARA level II. • Collective dose falls into ALARA level II.

  14. 1 week cooling time ATLAS ZDC re-installation – Xmas TS LTEX Meeting, September 13th - 2012

  15. ATLAS ZDC re-installation – Xmas TS Summarizing (1 week cooling time): 1 week cooling time • The estimated dose are done considering the maximum dose rate at the position of the worker (TAN aisle, TAN top or side on contact). • The individual dose for the ATLAS ZDC physicists falls into the ALARA level II. • Transport part is the same as for LHCf detector (they will be transported together/at the same moment). LTEX Meeting, September 13th - 2012

  16. ATLAS ZDC re-installation – Xmas TS Summarizing ( 1 day cooling time): 1 DAY cooling time • The estimated dose are done considering the maximum dose rate at the position of the worker (TAN aisle, TAN top or side on contact). • The individual dose for the ATLAS ZDC physicists falls into the ALARA level II. • Collective dose falls into ALARA level II. • Transport part is the same as for LHCf detector (they will be transported together/at the same moment). LTEX Meeting, September 13th - 2012

  17. TCL5 activation Residual dose rate on contact (mSv/h) LTEX Meeting, September 13th - 2012 measurements extrapolations • Extrapolation to 2015 is done considering: • the energy difference (3.5TeV to 6.5TeV) • a max peak luminosity of 2.2∙1034cm-2s-1

  18. Conclusions • The estimation for the Xmas TS are done considering 1 week cooling time • Some estimation for shorter cooling time (1 day) considering the absence of the MD before the Xmas TS • The estimation for the LS1 are done considering 3 months cooling time • All the estimations will be updated/reviewed using the survey measurements which will be done during next technical stop TS#3 LTEX Meeting, September 13th - 2012

  19. Thank Youfor your attention!

  20. ALARA Optimization is a legal requirement if accumulated individual dose exceeds 100 μSv/year (ALARA) LTEX Meeting, 5 April 2012 • Optimization includes • work coordination • work procedures • handling tools • design • material required optional