Radiation Protection aspects

Radiation Protection aspects. S. Roesler (DGS-RP) based on discussions with and information from M.Brugger, G.Dumont, D.Forkel-Wirth, L.Gatignon, M.Magistris, D.Perrin, C.Theis, V.Tromel, H.Vincke, M.Widorski. East Area Day 1 February 2012. Outline.

Download Presentation

Radiation Protection aspects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Radiation Protection aspects S. Roesler (DGS-RP) based on discussions with and information from M.Brugger, G.Dumont, D.Forkel-Wirth, L.Gatignon, M.Magistris, D.Perrin, C.Theis, V.Tromel, H.Vincke, M.Widorski East Area Day 1 February 2012

  2. Outline 1) Present situation and RP justification for consolidation 2) Dismantling and refurbishment 3) Design of new facility 4) Monitoring and operation 5) Summary and conclusions - work planning and ALARA - work on radioactive material - Radioactive waste - shielding - activation of components and optimization - air activation - cooling water activation - RAMSES - buffer zones East Area Day – RP Aspects

  3. Present situation – targetarea • Not optimized according to modern radiation protection practices • ageing components frequent repair, water leaks,... • significant losses, long passages of beam through air, tight space, difficult access • comparably high individual and collective doses • unjustified activation of air • corrosioncontamination risks • no ventilation system risk assessments difficult • faster corrosion • single water cooling circuit for target area and experiments • unjustified exposure of experimenters to activated water • large volume of activated water • A consolidation is urgently required and encouraged by RP East Area Day – RP Aspects

  4. East Area Day

  5. Present situation – mixed field test facilities • no ventilation system • confined target area intensity limitations • high energy muon cone (109 p/pulse at 400 GeV) • space constraints for placing equipment H4IRRAD CNRAD • parasitic operation, access only during stops of CNGS • no fast access • no tests of power converters possible Optimized within the constraints of the respective areas. Nevertheless, a dedicated test facility would be of advantage from an RP point-of-view. East Area Day – RP Aspects

  6. Dismantling and refurbishment – ALARA (presently under revision) Optimization is a legal requirement if accumulated individual dose exceeds 100 μSv/year (ALARA) (Safety Code F) Optimization includes • work coordination • work procedures • handling tools • design • material Level II+III: Detailed work-and-dose-planning (WDP/DIMR) Level III: ALARA committee Many dismanteling activities most likely Level II interventions East Area Day – RP Aspects

  7. Dismantling and refurbishment – ALARA Example of a work-and-dose-planning document East Area Day – RP Aspects

  8. Dismantling and refurbishment – radioactive material Radioactive = specific and total activities exceed LE or dose rate at 10cm distance > 0.1 μSv/h n ai  Mixture of nuclides: > 1 LE values: ingestion of activity LE leads to a dose of 10 μSv LEi i=1 Source: ORaP, Swiss legislation East Area Day – RP Aspects

  9. Dismantling and refurbishment – radioactive material and waste • all material taken out from target or beam-line areas has to be considered as radioactive • and placed in buffer zones • classification of material by RP measurement (dose rate, induced activity, contamination) • if radioactive: - any work must be performed in appropriate workshops • - equipment of workshop depends of type of work and radiological risks • - use of centralized workshops (Bat 867) strongly preferred • shielding to be re-used must be cleaned and painted by specialized company (removal of • rust and corrosion products in order to avoid spread of activated particles) • foresee storage space for radioactive components and shielding • radioactive material that cannot be re-used will have to be disposed of as radioactive waste • estimate of the amount of radioactive waste (volume, activity) prior to dismantling • assess the presence of waste that requires special attention (e.g., radioactive waste with • chemical risks) • in case container are needed they should be provided by the departments (take into • account delay for delivery) East Area Day – RP Aspects

  10. Dismantling and refurbishment – Example: Q74-02 • Q74-02: first quadrupole magnet in T9 line, • replaced in 2007, recently considered for re-installation • Measurements (Jan 2012): • max. residual dose rate (contact) 650 µSv/h • (40cm) 50 µSv/h • surface contamination 24.4 Bq/cm2 East Area Day – RP Aspects

  11. Design – shielding Goal: Supervised Radiation Area in East Hall outside of shielding enclosure Non-designated Area outside of East Hall East Area Day – RP Aspects

  12. Design – shielding Outside East Hall East Area Day – RP Aspects

  13. Design – shielding • shielding must not only satisfy limits but must also be optimized (ALARA) for workplaces • around the facility Safety Code F • consider incidents/accidents (e.g., accidental beam-losses): stay well below legal limits • for such events (6 mSv / 1 mSv inside / outside of hall) • if possible, shielding should be air-tight in order to separate air volumes • preliminary shielding studies have been performed and are integrated into the present • design; more detailed studies are needed, in particular for mazes, accidents and in order • to optimize design East Area Day – RP Aspects

  14. Design – activation of components • calculation of residual dose rates for most critical areas (target area, irradiation areas) • estimation of job doses (e.g., for recurrent or major work) and optimization of design • Design goal: < 2mSv/person/intervention Example: LHC collimators (one week cooling) • design optimizations don’t have to be expensive, e.g., connectors, valves easy to reach, • cables away from loss points (if possible),… • some residual dose rate predictions exist (mixed field facility), needed for other areas • (e.g., target area) East Area Day – RP Aspects

  15. Design – air activation Goal: < 1 µSv per hour stay in Radiation Areas (< 0.1 CA) monitoring of releases into environment Dedicated ventilation systems needed for target area and irradiation facility 2×1010 protons/s, 26GeV (generic study) 100 µSv • Requirements: • (general requirements on ventilation systems being discussed • by Ventilation Working Group) • no air flow between primary beam areas and occupied • areas • closed ventilation during operation (~100% recirculation) • flush with fresh air before access • controlled release point with activity monitoring 10 µSv 1 µSv Detailed study of air activation still has to be performed. East Area Day – RP Aspects

  16. Design – water activation • avoid unjustified contact of experimenters/workers with activated water • avoid dissemination of activated water Goal: • separate cooling water circuits for primary and secondary beam areas • study to estimate water activation to be performed East Area Day – RP Aspects

  17. Operation – radiation monitoring Present situation (Arcon) 10 radiation area monitors 7 induced activity monitors* * One of which used also for the measurement of pulsed radiation East Area Day – RP Aspects

  18. Operation – radiation monitoring * Old system based on VME chassis which cannot be compared to the new modular monitoring stations • additional monitoring budget (150 kCHF) reserved in irradiation facility budget • final monitor numbers and locations to be defined as soon as RP studies for final layout • are completed East Area Day – RP Aspects

  19. Operation – buffer zones • Two buffer zones for material from target area and irradiation facility: • similar to those presently being integrated around PS complex • in proximity to access point • 40cm concrete shielding, controlled access • containing shelves, waste bins, PC with ethernet for traceability system East Area Day – RP Aspects

  20. Summary and conclusions • The present East Area is not optimized according to modern radiation protection practices. • (high losses, tight space, no ventilation, corrosion, single cooling circuit,...) • Thus, a consolidation (especially of the target area) is urgently required and supported by • RP, if possible during LS1. • Preliminary shielding studies have been performed and are integrated into the present design, • further and more detailed studies are needed, in particular for mazes, accidents as well • as for activation of components, liquids and air. • The monitoring (RAMSES) budget requirement of 300+150kCHF seems appropriate. • The manpower needs have to be revised once a draft schedule is available. • A dedicated mixed-field facility for testing electronics equipment (replacing H4IRRAD and • CNRAD) would be of advantage from an RP point-of-view. • All work has to be well planned and optimized (ALARA, DIMR level I or II). RP is available • for advice. East Area Day – RP Aspects