1 / 5

NCSX Manufacturing Information Meeting

Plan is to hold ONE information meeting this summer that will cover the two main NCSX systems: Modular coils, including castings; Vacuum vessel The information meeting is scheduled for August 15. NCSX Manufacturing Information Meeting.

Download Presentation

NCSX Manufacturing Information Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plan is to hold ONE information meeting this summer that will cover the two main NCSX systems: Modular coils, including castings; Vacuum vessel The information meeting is scheduled for August 15 NCSX Manufacturing Information Meeting

  2. To gain general information about potential vendors and the state of the art. This input may modify our thinking on designs, specifications, budgets, schedules, etc. To solicit proposals for manufacturing studies. We hope to release several orders for modestly funded ($20-30K) manufacturing studies Purpose

  3. First priority is the modular coils. This effort will serve as the prototype for future areas. We need to: Prepare a design overview presentation that will be posted on the web and presented at an information. Should include what potential vendors need to know to manufacture the part. Prepare a System Design Description (SDD). This will serve as the basis of the information required for a manufacturing specification that will come later. Prepare a draft Manufacturing Specification. Will include expected QA and reporting requirements. Getting Started

  4. July 11-Write a descriptive paragraph for Procurement to advertise the information meeting (Heitzenroeder/Nelson) July 18 – Prepare a SDD for the modular coils. Discuss at the July 18 Wednesday meeting. (Heitzenroeder/Reiersen/Nelson) July 20 – Update and post the Design Overview presentation for the modular coils. (Nelson/ Heitzenroeder) July 27 – Prepare a draft Manufacturing Specification for the modular coils (Chrzanowski/Heitzenroeder/Nelson/Goranson) August 15– Hold the information meeting on the modular coils and vacuum vessel. Will include both on site and off site (MCI phone bridge / slides from web) participation. Proposed Schedule – Modular Coils (vacuum vessel tasks lag by 1 week)

  5. Propose staggering the schedule by 1 week. Will include explosion forming, casting, press forming vendors. The Vacuum Vessel information meeting will be held at the same time as the modular coil information meeting. Proposed Schedule – Vacuum Vessel

More Related