1 / 22

STRAW sector prototype plans approved solutions Dubna straws:

STRAW sector prototype plans approved solutions Dubna straws: new straw end pieces: D=11.2 mm and D=10.7 mm straws support tape items for discussion Presented by S.Movchan. Plans. Set of prototype drawing April/May

jsearcy
Download Presentation

STRAW sector prototype plans approved solutions Dubna straws:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STRAW sector prototype • plans • approved solutions • Dubna straws: • new straw end pieces: D=11.2 mm and D=10.7 mm • straws support tape • items for discussion • Presented by S.Movchan S.Movchan Straw status

  2. Plans • Set of prototype drawing April/May • Sector prototype production May • 40 straw prod. at Dubna and delivery to CERN June • 32 CERN straws assembly June • 32 Dubna straws assembly July • Vacuum test July-August • Anode wire crimping and tension measurement August • WEBs and 4 gas manifolds assembly August • Front-end integration September • Prototype install., consol adjustment, survey end of September • DAQ, grounding, front-end noise optimization October • Start up 12 October • Beam test start 17 October S.Movchan Straw status

  3. Approved solutions (after discussions): • Final geometry of single straw view (gap between neighboring straw • rows (h=1 mm) for straws support) Slava checked - OK! • Flange thickness: h=30 mm instead h=25 mm OK! • Model of Photon Veto tank -> see EDMS OK! • WEB final design (drawing) -> see EDMS OK! S.Movchan Straw status

  4. NEW flange thickness h=30 mm instead h=25 mm S.Movchan Straw status

  5. NEW prototype length: L=2260 mm instead L=2250 mm Free flange - Console!!! Fixed flange S.Movchan Straw status

  6. Dubna option (straw glue like into CREAM) S.Movchan Straw status

  7. NEW Dubna end pieces from aluminum Grooves: 1-st – GND 2-nd – GND safety against glue 3-d – for mylar glue 4-th – for end piece glue D=10.7 mm End piece glue accuracy +/- 15 µm D=11.2 mm S.Movchan Straw status

  8. Straw + WEB + anode pin Design based on CERN WEB End plug – NEW Anode pin - NEW (Dinternal ~ 1 mm) S.Movchan Straw status

  9. Anode wires positioning independent from straws • Precision: +/- 10 µm • Tools: • comb • 2x4 reference holes • on each flange S.Movchan Straw status

  10. NEW: straws support tape S.Movchan Straw status

  11. NEW: straws support tape S.Movchan Straw status

  12. Levan holes size: Big flange 13.00 - 0.07 mm and 10.90 + 0.08 mm Small flange 12.80 - 0.07 mm and 10.80 + 0.08 mm 8 Levan straws Rest 24 straws - like “CREAM” Slava holes size: Big flange 11.20 + 0.01 mm Small flange 10.70 + 0.01 mm S.Movchan Straw status

  13. New items for discussion: • Small flange: size between seal groves + 1 mm ? compare • with big flange • Gas manifold:gaps is 0.7 mm and 0.46 mm. What is guaranty that • straw end piece not must be cut? • For that is 3 holes M8 on each flange - ? • For that is 4 holes D=8H7 mm on each flange perimeter - ? • WEB on small flange is needed too • Design 3 new encloses for protection assembled straws from damage • Model of each gas manifold cells is needed (assembly procedure, • cell fixation to flange, WEB fixation, gas inlets and outlets, • pressure sensor and safety valve, …) • Sector prototype straw geometry alignment and check (modern method • and devises) • Prototype consol adjustment • Prototype survey S.Movchan Straw status

  14. Small flange Why this size + 1 mm compare with big flange? S.Movchan Straw status

  15. Gas manifold: Gaps are 0.7 mm and 0.46 mm That is guaranty that straw end piece not must be cut S.Movchan Straw status

  16. For what 3 holes M8 on each flange are ??? S.Movchan Straw status

  17. For what 4 holes D=8H7 mm on each flange are ??? S.Movchan Straw status

  18. for discussion We need WEB on this side too (for straw termination option) S.Movchan Straw status

  19. for discussion • Slava propose design 3 new encloses for • protection assembled straws from damage: • between bars • box for big flange (straw end pieces) • box for small flange (straw end pieces) • For this full set of sector prototype drawings is needed S.Movchan Straw status

  20. Sector prototype alignment Dubna conception based on glasses with cross: no enough place on flanges New method and equipment is needed (ask CERN survey group) S.Movchan Straw status

  21. Prototype consol adjustment Design is needed S.Movchan Straw status

  22. Prototype survey • CERN survey group: • prototype reference holes • reflectors • photo camera S.Movchan Straw status

More Related