1 / 1

Integrating Maintenance Activities into Pavement Management Systems

100. C. D. PCI. Actual. A. Observed. ?. Improvement. B. 3. 4. 5. Age. Omar Smadi Zachary Hans Aemal Khattak. Integrating Maintenance Activities into Pavement Management Systems. Results: 1. PCI and IRI improvements 2. Correct for deterioration (Age).

Download Presentation

Integrating Maintenance Activities into Pavement Management Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 100 C D PCI Actual A Observed ? Improvement B 3 4 5 Age Omar Smadi Zachary Hans Aemal Khattak Integrating Maintenance Activities into Pavement Management Systems Results: 1. PCI and IRI improvements 2. Correct for deterioration (Age) Introduction & Methodology: Maintenance activities impact on pavement condition STEPS: 1. Data Validation 2. Candidate Selection 3. Activity-Condition Assimilation 4. Activity Summary 5. Activity Condition Summary Project Length: 1.0 mi Project Length: X mi Project cost: $210,000 Project cost: $X Section Length: 0.5 mi Section Length: X mi Section A: Multiple activities. Discontinue analysis. Section B: Single activity (#2). Continue analysis. Conclusions: 1. Maintenance activities extend pavement life 2. Integrate with pavement management system (dTIMS) 3. More data needed to validate the results Intersecting Segment Length: 0.5 mi 0.4 mi 0.1 mi Total Project Length: 1.0 mi 1.0 mi Null Total Project Cost: $210,000 $210,000 Null History Section ID: Null B B Proportional Project Cost: NA (0.4/1.0 )*$ 210K NA =$84,000 History Section Coverage: NA 0.4/0.5=80% NA

More Related