Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas EMC PM#06 Mainz – 18/19 July 2006. EMC The preliminary EMC Control Plan has been completed and has been distributed to Consortium Members for comments before delivery to ESO
E N D
Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas • EMC • PM#06 Mainz – 18/19 July 2006
EMC • The preliminary EMC Control Plan has been completed and has been distributed to Consortium Members for comments before delivery to ESO • An EMC Spec has been prepared, based on ESO EMC requirements, in order to complete the Lower Level Specs issued by EIE and has been distributed to Consortium Members for comments. The aim is to support procurement activities and allow a proper traceability of ESO EMC requirements verification before delivery to ESO • The EMC Control Plan is based on prototype data available at AAS-I complemented with the information extracted from the presentations done at various PMs. The document will be updated as soon as the electrical design will be frozen.