20 likes | 112 Views
Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas PDM status at PM#6. PDM Status The accounts have been created for all AAS-I and AAS-F team members, they access Wand via AAS intranet and internet.
E N D
Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas • PDM status at PM#6
PDM Status • The accounts have been created for all AAS-I and AAS-F team members, they access Wand via AAS intranet and internet. • The licences for MT-A and EIE are available, an installation package has been provided. • MT-A and EIE will access Wand via internet. AAS-I has an action to create their accounts will be created this week. • An ALMA project has been created in Wand, it is structured according to PT 5.F (product tree and products numbering) and populated with all the documentation generated/received by the consortium ( 300 documents). • PDM Legacy for Wand usage is signed by all consortium members. • Wand is the tool selected by the consortium for Configuration control for the products, parts and documentation. To-day Wand is accessible and ready to be used.