60 likes | 196 Views
Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas Documents status at PM04 Dated April 6 th , 2006. CIDL extract delivered to ESO. List of documents delivered by ESO since the PM03 ESO-AEM TM 019 (2006-04-12): Front End Support Structure Material
E N D
Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas • Documents status at PM04 • Dated April 6th, 2006
List of documents delivered by ESO since the PM03 • ESO-AEM TM 019 (2006-04-12):Front End Support Structure Material • Action: AEM to note • ESO-AEM TM 020 (2006-05-03): Available Information about dust at the AOS-Panel Qualification • Action: AEM to note AEM to give us instructions on the further shipping of the Panels. • ESO-AEM TM 021 (2006- 05-03): Questions ALMA cables • Action: AEM to note
List of documents delivered by ESO (Cont’d) • ESO-AEM TM 022 (2006-05-15): Surface accuracy measurement done on the prototype AI 21 • Action: AEM to note, and to take this data into consideration for their further analyses (This closes the AI 21).
List of Change Proposals delivered by AEM to ESO since the PM 03 • ANTD-3300000-0-001-CRE (2006-05-15) • Access to the tilt degrees of freedom of the sub-reflector(ANT-ESO-34.001-A-CRE (2006-03-23) • ANTD-3300000-0-002- CRE (2006-05-15) • Transport brackets Bolts(ANT-ESO-34.002-A-CRE (2006-03-23)
List of TM delivered by AEM to ESO since the PM 03 • AEM-ESO TM 005 (2006-04-13): Proposal for Change Request process • Action: ESO to review the proposed CRE process and notify comments • AEM-ESO TM 009 (2006-04-13): Questions ALMA cables • Action: ESO to provide clarification to the questions of the TM