1 / 6

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas Documents status at PM03 Dated April 6 th , 2006. CIDL extract delivered to ESO. List of documents delivered by ESO Drawing FE Design Space FEND-40.00.00.00-026-C (in electronic format)

lainey
Download Presentation

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas • Documents status at PM03 • Dated April 6th, 2006

  2. CIDL extract delivered to ESO

  3. List of documents delivered by ESO • Drawing FE Design Space FEND-40.00.00.00-026-C (in electronic format) • Action 24 of the PM02 proposed to be closed • ESO-AEM TM 014 (2006-03-07):Rx Cabin cabinets views and HVAC questions • Action: AEM to give the relevant information • ESO-AEM TM 015 (2006-03-10): Product Tree ANTD-33-00.00.01.01-003-D-LIS • Action: AEM to update the Product Tree and submit the next update to ESO • ESO-AEM TM 016 (2006-03-29): Work Area Design • Actions 28 of AIL is closed - AEM to plan the meeting on site. - ESO to comment on the demands under points 10, 11, 12.

  4. List of documents delivered by ESO (Cont’d) • ESO-AEM TM 017 (2006-03-29): AEM Planning • Action: AEM to update the planning and to consider the possibility to transmit to ESO the updated planning at the beginning of last week of each month in the future. • ESO-AEM TM 018 (2006-04-03): Documentation Numbering • AEM Documentation Numbering scheme described in the TM is agreed by ESO. • ESO expects from AEM to send all the new documents with a numbering in accordance with the mentioned Documentation Numbering system. • Action: discussion about the retroactive nature of this numbering system to the documents already received by ESO.

  5. List of documents delivered by ESO (Cont’d) • ANT-ESO-34.001-A-CRE (2006-03-23): Access to the tilt degrees of freedom of the sub-reflector • Action: AEM to raise a Change proposal within four weeks of receipt of the letter dated 2006-03-24 • ANT-ESO-34.002-A-CRE (2006-03-23): Transport brackets Bolts • Action: AEM to raise a Change proposal within four weeks of receipt of the letter dated 2006-03-24

  6. List of TM delivered by AEM to ESO since the PM 02 • AEM-ESO TM 004 (2006-03-09): Questions OSF Work Area • Action # 28 of PM 02 proposed to be closed by AEM • AEM-ESO TM 006 (2006-03-30): Documentation Numbering • Action # 26 of PM 02 proposed to be closed by AEM • AEM-ESO TM 007 (2006-03-30): ALMA Update of general planning • Action: AEM hereby confirms the possibility to transmit to ESO the updated planning during the last week of each month in the future. • AEM-ESO TM 008 (2006-03-31): ALMA List of Items or Subsystems to be qualified • Actions # 11 & 27 of PM 02 proposed to be closed by AEM

More Related