CA Railroad Crossing Incidents 2003 through 2007 Averages: 155 incidents/year 33 fatalities/year 57 injuries/year Approx. 1 fatality and 2 injuries for every 5 incidents Potential for catastrophic consequences
How to Address • Closure or grade separation eliminates the hazard • Public Education and Law Enforcement • Particularly effective to address pedestrian safety • Engineering: Roadway geometry, traffic control devices, etc.
CPUC Role: Overview • Railroad Operations Safety • Railroad track, signaling, Haz. Mat., etc. • Works closely with Federal Railroad Administration • Rail Transit Safety • Includes BART, SF MUNI, Santa Clara VTA, etc. • Rail Crossings • Crossing project review and authorization • CEQA project review
CPUC Role: Rail Crossings • CPUC authorization required for: • Change in type of warning devices at public crossings • Road Modifications (widening, striping, sidewalks) • New crossings (at-grade and grade-separations) • Change in number of tracks • Authorization process • GO 88-B: Staff authorization of modifications • Formal Commission authorization
CPUC General Orders • CPUC establishes General Orders specifying rules and regulations: • GO 26-D: Minimum Clearances • GO 72-B: Crossing Surface Maintenance • GO 75-D: Standard Warning Devices • GO 88-B: Modification of Rail Crossings • GO 135: Blocked Crossings • GO 145: Crossings Exempt from Stop Req’s
Grade Crossing Safety Improvement Program (Section 130) • Funds safety improvements to identified hazardous public at-grade railroad crossings • Funds all construction related costs • In some cases may fund preliminary engineering • Statewide priority list
Quiet Zones CPUC Role in establishing a train horn ban: • Approval required for modifications of crossings (“Supplementary” or “Alternative” Safety Measures) • Diagnostic Review at all crossings in corridor • Pedestrian-only and private crossings must be treated in accordance with the diagnostic team findings.
Diagnostic Review • Field review of crossing and proposed modifications • Knowledgeable representatives of parties of interest • Roadway Agency, Railroad, and CPUC • Evaluates conditions at crossing to make determinations or recommendations concerning safety needs
Signs and Markings • Railroad or transit agency physically maintains the CPUC Standard warning devices (e.g. Crossbuck, Flashers, Gates) • Maintenance costs often shared by public agency • Local agency / Roadway Authority: All other signs, markings and traffic signals are placed and maintained by the roadway authority
Placement of Crossbuck • Minimum standard warning device on each crossing approach • “Passive” device (not train activated) • Motorists must “Yield” to trains • Sight lines to approaching trains must be considered carefully
Retro-reflective Standard 1 (old) Standard 1-R (retroreflective)
Placement of Flashers • Equivalent to STOP sign when activated – driver may proceed if safe • Sufficient sight distances necessary • Might consider where trailer trucks present gate maintenance problems • Can provide additional pedestrian warning
Placement of Gates • Generally placed where trains travel at greater speeds and/or frequency • May increase visibility of the warning devices • Legally prohibits motorists from proceeding
Standard Warning Devices • Equivalent interpretation • Crossbuck = YIELD sign • Activated Flashers = STOP sign • Activated Gates = Solid Red Traffic Signal • If sight lines to an approaching train are insufficient, automatic gates are needed
Urban Concerns • Queuing • Gate Drive Around • Pedestrians
Field vs. Office • Railroad crossing queues are best observed in the field • Traffic simulation and modeling can be misleading in the vicinity of crossings • Queues that build up during the passage of one train may not dissipate prior to arrival of a second train
Addressing Queuing • Traffic signals • Pre-signals / Queue Cutter • DO NOT STOP ON TRACKS sign • Hatch / KEEP CLEAR markings • Temporary Traffic Control Zones • Relocate the sources of queuing (driveway, bus stop, etc.)
Signalization of Intersections Near Crossings • Roadway intersections near crossings present special condition where traffic signals should be considered • Particular concern where STOP sign requires vehicles to queue or stop on track • Installation of traffic signal may be the best solution to clear motorists from the rail crossing • FHWA has proposed Warrant 9
Traffic Signals Near Crossing • Railroad preemption generally provided if queuing extends to the rail crossing • May be necessary even if > 200 feet away • “Track clearance green” moves vehicles off tracks. Appropriate duration must be determined by the local agency. • Consider pedestrian clearance • Should prohibit movements toward track during railroad preemption • Avoid all-red-flash
DO NOT STOP ON TRACKS Signs • Should be placed when engineering judgment determines that potential for vehicle stopping on the tracks is high • Can be placed on curb and median (or both), near or far side of track (or both)
Other Queuing Concerns • Driveways • Parallel Parking • Loading • Pedestrian traffic • Another railroad crossing • Construction Zone • Bus Stop
Temporary Traffic Control • Construction zones near crossing must avoid queuing on the track • Flagger may be required • MUTCD Figure 6H-46 • GO 72-B
Urban Concerns • Queuing • Gate Drive Around • Pedestrians
Medians • Often placed with gates to provide “gated & channelized” design • Discourages gate drive-around violations • Inexpensive compared to additional warning devices (such as exit gates) • Recommended min. 100-foot length • May allow median warning devices
Urban Concerns • Queuing • Gate Drive Around • Pedestrians
Pedestrian Crossings • Pedestrians will take most direct route • Need to channelize (fencing, barriers) • Consider additional warning devices in “off-quadrant” • Audible warning is essential • ADA requirements • Pedestrian crossing incidents often involve a second train
Gated & Channelized • Pedestrian gates across pathway • Swing gates for emergency exit • Fencing for channelizing pedestrians to safe crossing location • Alternative: Combination of swing gates and flashers