An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 01-18-2010 FORMOSAT-3 / COSMIC IWG Meeting at the 90th AMS Annual Meeting in Atlanta, Georgia FORMOSAT-3 Follow-On / COSMIC-II NSPO Plan Nick Yen, NSPO

  2. Follow-On Mission v.s. FORMOSAT-3/COSMIC (1/2)

  3. Follow-On Mission v.s. FORMOSAT-3/COSMIC (2/2)

  4. Societal Impacts Enhance the Capabilities of Regional and Global Weather Prediction Explore Space Weather Sciences Enhance the Capability on Severe Weather Prediction Monitor Climate Trend

  5. Mission Architecture GLONASS-CDMA GPS High-inc GALILEO Low-inc Follow-On Fiducial Network TT&C stations (overseas) TT&C stations (Taiwan) Data Processing Center Satellite Operations and Control Center Users Users

  6. Joint Mission NSPO/NOAA Mission NSPO/NOAA S/C Bus NSPO/TBD Payloads NOAA/NSPO Launch Sys. NOAA/TBD Ground Sys. NOAA/NSPO Data Process NOAA/NSPO Mission Ops NSPO/NOAA SOCC NSPO L&EO NSPO/NOAA Constellation NSPO/NOAA System Design NSPO Tri-G PL NOAA/JPL Cluster Launch NOAA/TBD TACC Upgrade CWB 2~3 Launches Taiwan LTS NSPO Constellation Deployment NSPO CDAAC Upgrade UCAR Interfaces NSPO Taiwan Components ROC Vendor Sci. PL NSPO/NOAA US RTS NOAA Normal Ops NSPO GPS-ARC NCU Verification NSPO/NOAA Bus Components NSPO/TBD Europe RTS EUMETSAT I&T/EDM/GSE NSPO Mission Collaboration between NSPO and NOAA

  7. Program Milestone SDR CDR 2nd PSR 3rd PSR 1st PSR ITR 2010/6 2011/9 2013/12 2016/8 2015/4 2012/6 MDR/SRR 2010/3 Advanced Advanced Advanced Payload Bus Payload Design EM FM FY 2012 FY 2013 FY 2014 FY2015 FY2016 FY2017 FY2018 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 PDR CDR CDR FOC FDR △ITR 2018/2 2010/2 2010/11 2013/7 2nd Launch 3rd Launch 1st Launch 2015/8 2016/12 2014/3

  8. Potential Follow-On Constellation FORMOSAT-3 FORMOSAT-3 FO 任務規劃 8 high-inclination-angle SCs + 4 low-inclination-angle SCs Data is distributed homogenously Courtesy of UCAR

  9. Follow-On Spacecraft Bus Highlight

  10. Current Status and Near Term Activities • Follow-On Program Proposal and FORMOSAT-7/COSMIC-2 Agreement have reached the final stage for formal approval and signature at NSC. • The Mission Feasibility Design Review at mission level is planned to be held in February. • NOAA is coordinating Level-1 requirement document and NSPO has been drafting mission requirement document. These two documents will become the baselines for the Follow-On mission. The Mission Definition Review is planned to be held in late March. • NSPO has been developing spacecraft straw- man design. The Mission System Requirement Review is planned to be held in late March.

  11. Thank You !