An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mayo de 2012 Vinculación con la Comunidad.

  2. Deportivo El Palmar.

  3. Deportivo El Palmar.

  4. Ubicación de Proyecto

  5. Ubicación de Proyecto

  6. Deportivo El Palmar

  7. Descripción de Etapas. • 5ta Etapa; • Alumbrado • Gradas Oeste $2,115,329.20 $1,392,319.18 $985,826.70 $939,089.39 $409,243.08

  8. Emp. Com. Por Def. Mun. Etapa 1 Cancha Soccer 07% 11% 71% 00% Gradas Sur 00% 23% 77% 00% Baños y Vest. 00% 31% 08% 61% Desvío de Agua 00% 68% 32% 00% Cercado 00% 00% 00% 100% Etapa 2 Edificio Deportivo 00% 24% 09% 67% Gradas Norte 00% 28% 72% 00% Etapa 3 Cancha de Fut Rápido 00% 20% 31% 49% Gradas Fut Rápido 00% 28% 72% 00% Juegos Infantiles 00% 45% 55% 00% Etapa 4 Cancha Basquet 00% 25% 14% 61% Gradas Basquet 00% 35% 65% 00% Etapa 5 Alumbrado 00% 00% 00% 100% Gradas Oeste 00% 20% 36% 44%

  9. Deportivo El Palmar. Participación Tripartita