1 / 11

Surface Facility Design Group 9 AJKM

Surface Facility Design Group 9 AJKM. Waleed Al- harbi , Mitchell Joseph Khalil Kasali Abdul Mdee Mohammed Mohammed. Location of Lease (Surface Facility). Stanley , North Dakota Bakken Formation Extreme weather conditions: 2 acre lease= 87,120 ft squared 16 wells

karli
Download Presentation

Surface Facility Design Group 9 AJKM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Surface Facility DesignGroup 9 AJKM Waleed Al-harbi, Mitchell Joseph Khalil Kasali Abdul Mdee Mohammed Mohammed

  2. Location of Lease (Surface Facility) • Stanley , North Dakota • Bakken Formation • Extreme weather conditions: • 2 acre lease= 87,120 ft squared • 16 wells • Spacing of wells = every 15 yards

  3. Vendors (Service Companies) • Casing/Cementing • Drilling • Wellhead/ Production Tree • Fracking Crew • Separator/ Heater • Stock Tanks • Water Transport • Glycol Dehydration Unit • Maintenance • Schlumberger • Precision Drilling • Cameron • Universal Well • Pesco • HG Tanks • Western Petroleum • Cameron • Key Energy Services

  4. Wellhead Installation • Casing Head-the lowest part of the wellhead that is almost always connected to the surface casing string • Tubing Head- attached to the casing spool used to hang the tubing (smallest casing string) and seal the annulus between the tubing and casing.

  5. Surface Facility Design • The job of the production facility is to separate the well stream into 3 components • The 3 components “phases” are: oil, gas, and water • Then process theses phases into some marketable products or dispose of them in a environmentally safe manner

  6. Vertical Design (Two Phase)

  7. Horizontal Design (Two Phase)

  8. Vertical Separator Design (Three Phase)

  9. Horizontal Separator (Three Phase)

  10. Glycol Dehydration Design • We are using the structured packing in our design to less the cost of operations • We estimated that the glycol circulation rate (Rc) to be 5 gal TEG/lbH2o • P = 900 psia, T = 75 F Win = 35 lbH2O/MMscf • DP = 15 F • The dew point depression is 75 F – 15 F = 60 F

  11. Hydrate Prevention In Pipelines • Gas hydrates are crystalline solids in which gas molecules are encased in cages of water molecules • Hydrates are associated with major and potentially hazardous flow problems, especially in offshore operations • 4 elements are needed in the formation of hydrates : Water, Natural Gas, Low temperature, and High pressure