100 likes | 350 Views
APT Steering Committee Road Pavement Forum – November 2002 E.Sadzik. HVS. MMLS. APT Steering Committee. Background Approved by RPF in May 2002 Objectives: Coordinate and prioritise APT research Serve as advisory body to Gautrans HVS programme
E N D
APT Steering CommitteeRoad Pavement Forum – November 2002E.Sadzik HVS MMLS
APT Steering Committee Background • Approved by RPF in May 2002 • Objectives: • Coordinate and prioritise APT research • Serve as advisory body to Gautrans HVS programme • Give comments on APT work proposals and reports
APT Steering Committee 1M. Henderson PAWC 2E. Horak University of Pretoria 3F. Hugo ITT 4K. Jenkins University of Stellenbosch 5R. Lorio UW&P Engineering 6 F. Netterberg Consulting Eng. 7S. Oloo KZN 8 B. PerryCCI 9 D. Rossmann SANRAL 10E. Sadzik GAUTRANS 11 A. Taute SABITA 12 H. Theyse CSIR: Transportek 13 B. Verhaeghe CSIR: Transportek
APT Steering Committee Objective: prioritisation of APT research • Cold recycling (ETB and FB) • Asphalt overlays (comparison) • Suitable materials for intersections • Upgrading of gravel roads With inclusion of: • Vehicle-pavement interaction (impact on design and deterioration models) • Risk assessment (comparative testing)
APT Steering Committee Research Priorities • Cold recycling (ETB and FB) • Verification of permanent deformation and fatigue models for a greater variety of materials • Suitable materials for intersections • Rut resistance of various HMA (combination of mix type and polymer modified binder) • Calibrate wheel tracking test with field performance (APT, LTPP) • Concrete inlays
APT Steering Committee Research Priorities (cont) • Asphalt overlays • APT tests on currently used HMA / seal types to validate their field performance • Develop performance models depending on: • Condition of existing surface, deflections, climate, type of overlay and design criteria
APT Steering Committee Research Priorities (cont) • Upgrading of gravel roads • Investigate innovative techniques and technologies e.g.75mm FB + surfacing • Identify cost-effective solutions • Focus on LIC
APT Steering Committee Objective: Give comments on APT work proposals • Work proposals: • Laboratory and HVS testing on N7 – comments received • Measurement of moisture sensitivity FB on N7 (MMLS) – pending • National data base on recycling (ETB+FB) - pending • LTPP protocol - pending
APT Steering Committee Objective: Coordinate APT research • Cooperation on recycling (FB) project N7 • SANRAL • Western Cape • Gautrans • Cooperation on guidelines for use of ETB • SABITA • Gautrans
APT Steering Committee Objective: Serve as advisory body to the Gautrans HVS programme • Identify future HVS project