The Source Card Project. Andy Rose Imperial College London February 2007. Hardware Status (i). 24 delivered from Exception EMS -> 23 with wrong analogue regulators, the one that didn ’ t had a solder bridge across Pin diode differential pair … Not a great start …
E N D
The Source Card Project Andy Rose Imperial College London February 2007 Andrew Rose Imperial College London
Hardware Status (i) 24 delivered from Exception EMS -> 23 with wrong analogue regulators, the one that didn’t had a solder bridge across Pin diode differential pair… Not a great start… Also, 1 card was damaged (TLKs) by over-voltage. Cards were collected by Exception and returned next day with regulators and blown TLKs replaced. Andrew Rose Imperial College London
Hardware Status (ii) Current Hardware Status – 36 received • Good News • 12 boards passed FullTest (<10-12) and have TTC address set • 7 boards passed FullTest but no TTC address yet • 4 boards passed FullTest but have broken LEDs (need re-flow) • 23 • 2 still being/to be tested • Bad News • 1 board has faulty LED and cannot lock onto RCT • 7 have issues accessing TTCrx • 1 cannot lock to RCT (stuck bit) • 2 boards unrecognised by PC • 11 Andrew Rose Imperial College London
Hardware Status (iii) (Still) awaiting front panels – they were shipped last week and should be here by now… NON-halogen free components for testing electron trigger have arrived at IC. Hub cards ready for assembly. ????? Status of Rack PCs ????? Andrew Rose Imperial College London
Software Status XDAQ card control is super… Both Global/Individual control and configuration are working without issues. Two issues currently being resolved: - RCT readout throws board access exception - Loading Transmitter Block RAM causes core dump… Will be resolved asap… Andrew Rose Imperial College London