Supplementary BP3000 PM Procedures for INTEL Shanghai Revision 1.01

Supplementary BP3000 PM Procedures for INTEL Shanghai Revision 1.01. Date : Dec 09, 2004 by Bryan Chung. Machine Preparation & PM. Daily machine setup Preparation before each shift MTE preparation Operator preparation PM cleaning & maintenance Weekly Monthly Semi-annual Annual.

kato
Download Presentation

Supplementary BP3000 PM Procedures for INTEL Shanghai Revision 1.01

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supplementary BP3000 PM Proceduresfor INTEL ShanghaiRevision 1.01 Date : Dec 09, 2004 by Bryan Chung

  2. Machine Preparation & PM • Daily machine setup • Preparation before each shift • MTE preparation • Operator preparation • PM cleaning & maintenance • Weekly • Monthly • Semi-annual • Annual

  3. Daily Machine Preparation (before each shift) • Prepare by operator • Run one tray (dummy) checking for flux coverage • Confirm flux coverage • Run one tray (dummy) checking for ball placement • Confirm ball placement position • Run three trays (dummy) on ball placement after reflow • Make sure no merge ball after reflow • If they found any problems, assist for help from MTE

  4. Daily Machine Setup (before each shift) • Prepare by MTE • Pin-head cleaning (level 1: pin tip cleaning using acetone & paper) • Pick-head cleaning (level 1: using brush & air blow gun) • BSU cleaning (level 1: using brush & air blow gun) • FSU & sweepers cleaning (level 1:using acetone)

  5. Weekly PM • Pin-head cleaning (level 2: complete cleaning on pin head) • Cleaning on pin-head block which has problems • Pick-head cleaning (level 2: using brush & air blow gun with distillated water) • BSU cleaning (level 2: using brush & air blow with gun with distillated water) • FSU units & surrounding cleaning (level 2: using acetone) • Cleaning FSU, FSU sweepers & surrounding • Remove any flux drop surround FSU unit • Specially around sensors • Remove & clean all unused balls from ball bins (by IPA)

  6. Monthly PM • Replace filters in FSU auto-fill flux filters • Cleaning on BSU sweeper by IPA • Remove all the balls inside sweeper • Remove BSU sweeper • Cleaning BSU sweeper by IPA • Confirm BSU sweeper gap level • 5-8c • Remove all balls which drop in machine • Missing ball bins • Remaining ball bins • BSU bins

  7. Semi-Annual PM • Check indexer position on all motors • Run 200 trays w/units for indexing demo

  8. Annual PM • Check the functionality all vacuum pumps & sensors • Grease all axis LM guides and ball screws

  9. < THE END >