1 / 8

TC-meeting 2012-09-13 5.2 Pull-through test for boards - Offer Dr. Oberhaus

13/020. TC-meeting 2012-09-13 5.2 Pull-through test for boards - Offer Dr. Oberhaus 6.1 Inclusion of HFO blowing agents in product standards - Meeting 2012-10-31 – CEN TC 88 WG 6 8.2 TC 88 WG 6 PU boards - Meeting 2012-10-31 – CEN TC 88 WG 6 - Annex ZA – CPR meeting 2012-12-20

Download Presentation

TC-meeting 2012-09-13 5.2 Pull-through test for boards - Offer Dr. Oberhaus

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 13/020 TC-meeting 2012-09-13 5.2 Pull-through test for boards- Offer Dr. Oberhaus 6.1 Inclusion of HFO blowing agents in product standards- Meeting 2012-10-31 – CEN TC 88 WG 6 8.2 TC 88 WG 6 PU boards- Meeting 2012-10-31 – CEN TC 88 WG 6 - Annex ZA – CPR meeting 2012-12-20 8.6 TC 88 WG 18 ETICS - ETICS specifications - PU Adhesive foam - Pull-through (see 5.2) - Alkali resistance ( see report RW) - Associations Joachim Kleser

  2. 5.2 Pull-through test for boards- Offer Dr. Oberhaus 2013-01-07 • Wind load resistance • Pull through tests • Foam block tests • Sample manufacturing • Report • Expert´s report • 17 863,- Euro

  3. 6.1 Inclusion of HFO blowing agents in product standard- Meeting 2012-10-31 – CEN TC 88 WG 6 (see doc N 884) Blowing agents manufactures + WG 6 members discussed what is the program needed for the introduction of new blowing agents into EN 13165 annex C The intentions of the fixed increment, of accelerated aging and of the normality test have been explained. Testing of products with new blowing agents should be checked on aging (accelerated aging); when possible testing should be tuned with the current PU Europe test program. The following actions shall be taken: A1.1 Start internal λ-aging-programme for new permanent blowing agents: A1.2 Co-ordinate / support programme A1.3 Elaborate proposal for testing programme (>2012-11): A1.4 Create aging data internally, according to the running λ-aging programme: A1.5 Check final test programme with relevant test-institutes (FIW, CSTB, …) A2.1 Start internal λ-aging programme for additives remaining in cell-gas (>2012-11): A2.2 Evaluate internal data: A2.3 Create (if necessary) aging data for gaseous additives in cells according to the running λ-aging program: Mr. Socha + PU manufactures A2.4 Check final test program with relevant test-institutes (FIW, CSTB, …)

  4. 8.2 TC 88 WG 6 PU boards- Meeting 2012-10-31 – CEN TC 88 WG 6 (see doc N875, N884) • Agenda N 875

  5. 8.2 TC 88 WG 6 PU boards- Meeting 2012-10-31 – CEN TC 88 WG 6 (see doc N875, N884) • Action points from the minutes N 884 2. New blowing agents A1.1 Start internal λ-aging-programme for new permanent blowing agents: A1.2 Co-ordinate / support programme: PU Europe / Walter A1.3 Elaborate proposal for testing programme (>2012-11):Walter, Keller, Tarzi, Socha A1.4 Create aging data internally, according to the running λ-aging programme: Keller, Tarzi + PU manufactures A1.5 Check final test programme with relevant test-institutes (FIW, CSTB, …) A2.1 Start internal λ-aging programme for additives remaining in cell-gas (>2012-11): A2.2 Evaluate internal data: Socha + PU manufactures A2.3 Create (if necessary) aging data for gaseous additives in cells according to the running λ-aging programme: Socha + PU manufactures A2.4 Check final test programme with relevant test-institutes (FIW, CSTB, …) 4. Revision of EN 13165 A3.1 Clarify if there exist initiatives for a harmonized presentation format for DOPs 4. Revision of EN 13165 A3.1 Clarify if there exist initiatives for a harmonized presentation format for DOPs for thermal insulation products at TC88 secretariat: De Winkel A3.2 Draft (when needed) a proposal for a harmonized presentation format: Vermeulen 8. ETICS (annex B of ETICS standard) The need for a test procedure for the tensile strength of Thermal Insulation Product as proposed ( 7days/ 50°C / 90% r.H) has to be clarified by Mr. Lohman (convenor of CEN/TC 88/WG 18). A.4 Mr. Kleser will send a letter to Mr. Lohman requesting clarification on request.

  6. 8.2 TC 88 WG 6 PU boards- Annex ZA – CPR meeting 2012-12-20 Minutes CEN TC88 WG2 AH4 meeting 20 12 2012 CEN TC99 WG2 AH4 CPR N050 Participants: P.Becker, D.VanMoorsel, J.Kleser, G.Curtenat, P.Vitse, J.Carvalho, W.Neuherz, R.Da Silva, R.De Block (RDB) Excused: M.Makas, E.Rasmussen, J.Fischer, J.Cuche • The objective of the meeting was to prepare final drafts CPR amendments for factory made building thermal insulation standards. We had to agree on the comments on the secretariats observations and the remarks of Mr J Cuche. • We agreed first on the general items and agreed after on PU, EPB, Cork, XPS and CG. Many observations are the same and many editorial mistakes are in the amendments (e.g. mention of MW in other standards) • For PU related issues se e the following document: 13165_Secretariats_observations_rem2012-12-20 (2) • Such as decided in our meeting on 20 12 2012, we have to follow a very strict planning if we want that the UAP formal vote shall start before 1 7 2013. • The agreed planning is: 30 12 2012 RDB is mailing the minutes and the decisions taken. Also the general comments agreed and valid for all products. (this mail) 10 1 2013 All product WG’s conveners are mailing the specific agreed comments on the secretariats observations to RDB and Leticia de Anda Gonzales. 15 1 2013 RDB is checking the proposals and mail agreement to Leticia de Anda Gonzales . 16 1 2013-XXXX Each of the conveners shall have to help Leticia de Anda Gonzales to implement the agreed changes 29 1 2013 Meeting of CEN TC88 WG10 on CPR. Agreed amendment for buildings have to be adapted to building eaquipments and Industry products.

  7. 8.6 TC 88 WG 18 ETICS • ETICS specifications-new TG has been founded to work on the ETICS specifications, first meeting end of January, Kleser/Meredith involved • PU Adhesive foam- WG 18 TG 7 worked out an proposal to include PU adhesive foam in the ETICS standard based on EOTA Guideline (to be finished by DIBt) , chairman J. Kleser • Pull-through - Offer Dr. Oberhaus 2013-01-07 - for details see topic 5.2 • Alkali resistance- Proposal for test procedure: pH-value of 13, adhesion of the facing before and after exposure to the alkaline solution first results expected in March - for details see presentation RW • Associations- EAE TC meeting 2013-01-17 - set up TG fire safety on ETICS, Daems involved - proposal to include PU in the EAE application guideline

  8. Thank you for your attention www.pu-europe.eu

More Related