1 / 7

Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics

Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. Kaur @ India-CMS meeting, BARC, Mumbai, 28-29 July, 2011. CMS HO Calorimeter HO has been fabricated, installed and commissioned by Indian Groups (TIFR +PU)

Download Presentation

Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. Kaur @ India-CMS meeting, BARC, Mumbai, 28-29 July, 2011

  2. CMS HO Calorimeter • HO has been fabricated, installed and commissioned by Indian Groups (TIFR +PU) • Issues • Outer rings having inadequate S/B ratio for MIPS • HPDs in outer rings have phasing out. • Solution • Replace HPDs with read out device Si-PM • Achieve excellent resolution • Insensitive to ambient magnetic field • Compact • Not much electronics is needed

  3. Current Activities • TB2011 (17-29 July, 2011 ; HO 18, 19 July) • HO Continuing for parasitic stability studies during HB data taking period (21-28 July) • Studying response of Si-PM for HO to the particle beams using e 20, 50, 80, 100, 150 GeV  20, 50, 100, 150, 200, 300 GeV  150, 225 GeV • Analysis of data • Currently going on – results to be compiled in CMS notes/publications and in the Ph.D. thesis.

  4. Upgrade of Outer Hadron Calorimeter • Fabrication of Si-PM control Boards -- Prototype • fabrication carried out successfully in India -CRL, Ooty • Production and Quality Control of 160 Boards to be done by Indian group

  5. Si-PM Boards • Fabrication & QC of 120 Boards (2196 Channels) to be • carried out Indian Group • Validation of SiPM for CMS environment • Testbeam studies, stability, radiation hardness, magnetic field immunity, saturation effects • Installation • Assembly of Read out boxes • QC • Burn-in Test at CERN to be carried out jointly • by CERN/India • Setting up test facility • LED Calibration Setup

  6. LED Calibration Setup Signal Generator LED SiPM Signal Trigger qADC VME Crate Computer Data