1 / 14

Resource and Energy Recovery Facility

Resource and Energy Recovery Facility. A technological breakthrough that redefines the waste-to-energy category June 26, 2009. Visiam. Vision: Visiam creates cleaner, greener communities through superior processing and utilization of waste. Mission:

kerryn
Download Presentation

Resource and Energy Recovery Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Resource and Energy Recovery Facility A technological breakthrough that redefines the waste-to-energy category June 26, 2009

  2. Visiam Vision: Visiam creates cleaner, greener communities through superior processing and utilization of waste. Mission: Visiam will develop and deploy straightforward, financially viable technologies that process MSW, biomass and other organic wastes in a manner that: • maximizes recovery of recyclable material, • utilizes available energy content, and • supports sustainable communities by substantially reducing environmental impacts

  3. Visiam Pre-Process

  4. The Visiam Solution

  5. Clean, Separated, Recyclables

  6. Organics

  7. Scalability of Visiam • The three basic configurations are:

  8. Visiam Target Markets

  9. Benefits • Flexibility in inputs • Maximized volume reduction • Efficient separation of MSW into usable components • Minimal post processing of recyclables • Maximized commodities recycling • Closed-loop feed water system • Generation of clean WTE, without incineration • Improved quality of organic biomass • Cleaner end product

  10. Partnerships and Studies

  11. Financial Feasibility of Visiam Solution Projects (Private Ownership) Does not include any benefits from current and proposed Federal stimulus or renewable energy incentives

  12. Financial Feasibility of Visiam Solution Projects (Municipal Ownership) Does not include any benefits from current and proposed Federal stimulus or renewable energy incentives

  13. Visiam Facility • 28,000 ton per year Commercial Demonstration Facility in MN, integrating vessels, trommel and MERF, digestion and generation • A 10-year Waste Delivery contract signed with an independent hauler • Currently negotiating a site outside of the Twin Cities Metro area • Operational 6 months after completion of permitting

  14. Come Visit / Contact • R&D Facility – Blaine, MN • “Mini-Me” with Trommel Scott Hughes COO shughes@thinkvisiam.com 612.455.0900 x 101

More Related