Ministry of Water Resources , Irrigation & Electricity. ELECTRICITY SECTOR Investment Opportunities Proposed Projects for Promo tion. General Information. Total Installed Capacity = 3729 MW Thermal Power Generation = 1814 MW Hydro Power Generation = 1915 MW
E N D
Ministry of Water Resources , Irrigation & Electricity ELECTRICITY SECTOR Investment Opportunities Proposed Projects for Promotion
General Information • Total Installed Capacity = 3729 MW • Thermal Power Generation =1814 MW • Hydro Power Generation = 1915 MW • MAX Load – 2018 =3180 MW • Max Energy Per Day – 2017 =58.757 GWH • Number of Customers =2,605,000 • Energy Access up to now = 34 % • Average Annual Growth = 14 %
HYDRO POWER DAL Dam • Location : Second Cataract at DAL area ( Nile River State) (North of Khartoum) • Generation Capacity: 8 Units – 642 MW. • Feasibility Study: Completed. • Estimated Cost = 1.5 B.euro 0
Dagash Dam • Location : South of Mograt Island (Nile River State) (North of Sudan ) • Generation Capacity: 8 units with total capacity 320MW. • Construction period 5 years. • Feasibility Study: Completed • .Estimated Cost = 542 Meuro • . 0
Kajbar Dam 0 Location : 120 km north the city of Dongola. Generation Capacity: 360 MW (6X60MW) Kaplan type. Project Status: Feasibility Study Completed. Estimated Cost = 894 MUS$
Shereik Dam Location : on the 5th Nile cataract. Generation Capacity: 420 MW (6X70MW) Kaplan type. Project Status : Feasibility Study Completed. Estimated Cost = 898 MUS$ 0
Rosaries Hydro Power Plant Upgrading • The Current Condition :- • 7 Units with total capacity 280 MW • To be Upgraded to : 442 • Feasibility Study Available . • Estimated Cost = 170 MUS$
THERMAL POWER Red Sea Coal Fired Power plant Project Location: Red sea state in eastern Sudan - north of Port Sudan Generation Capacity : Coal Power Plant 2 X 300 MW Plant fuel type: coal Project contract type : turnkey project. Project Status : Feasibility Study Completed Estimated Cost = 0.9 BUS$
Red Sea Combined Cycle Project • 1500 MW ( 1000 MW Gas Turbines & 500 MW Steam Turbines ) . • PROJECT STATUS : Site selected , Bankable Feasibility Study Completed , Ready for Funding . • Fuel type GAS ( Liquid Natural Gas - LNG ) • Estimated Cost = 1.2 BUS$ ( Including The Gas Terminal)
Details of Red Sea Combined Cycle: • Block 1 CC:- • 2X 170 Siemens Gas Turbines i/p • 1X170 MW Steam Turbine + HRC Needed • Block 2 CC :- • 2X 170 MW Gas Turbine Needed . • 1X 170 MW Steam Turbine + HRC Needed • Block 3 CC :- • 2X 170 MW Gas Turbine Needed . • 1X 170 MW Steam Turbine + HRC Needed
TRANSMISSIONKhartoum 500 KV Line Project Location: Khartoum RING Route Length: 260km OHTL – 500KV Line Substation: 3New substations 500/220/33 KV Feasibility Study Completed. Estimated Cost 300 MUS$
West Sudan 220 KV Transmission Lines Projects • South Kordofan = 60 KM. North Kordofan = 218 KM. • West Kordofan = 90 KM. • North Kordofan to Darfur = 552 KM. • Darfur Lines = 320 KM. • Total Estimated Cost = 1 BUS$ • All Feasibility Studies are Completed.
Renewable Energy Wind Atlas Average wind speed 4.2 – 8.5 M/Sat 80 meters above ground level (agl) Areas with highest wind speed: Red Sea Northern Sudan (Dongola) Jabel Marra Mountains in western Sudan
Renewable Energy Solar Atlas Average daily solar Irradiation: 5.8– 7.2 kWh/m2 The solar radiation increases in northern and west-northern areas and decreases towards the south
500 MW Solar Power Projects • Proposed Projects for IPP (BOOT,BOO,..) • 200 MW Omdurman Gomouia PV Solar PP. • 200 MW West Omdurman PV Solar PP. • 100 MW Elgobosh (River Nile State).
1250 MW Wind Energy Projects • Proposed Projects for IPP (BOOT,BOO,..) • All in Dongola Site (Northern State) . • 1st PP 250 MW. • 2nd PP 500 MW. • 3rd PP 500 MW .