An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ministry of Water Resources , Irrigation & Electricity ELECTRICITY SECTOR Investment Opportunities Proposed Projects for Promotion

  2. General Information • Total Installed Capacity = 3729 MW • Thermal Power Generation =1814 MW • Hydro Power Generation = 1915 MW • MAX Load – 2018 =3180 MW • Max Energy Per Day – 2017 =58.757 GWH • Number of Customers =2,605,000 • Energy Access up to now = 34 % • Average Annual Growth = 14 %

  3. HYDRO POWER DAL Dam • Location : Second Cataract at DAL area ( Nile River State) (North of Khartoum) • Generation Capacity: 8 Units – 642 MW. • Feasibility Study: Completed. • Estimated Cost = 1.5 B.euro 0

  4. Dagash Dam • Location : South of Mograt Island (Nile River State) (North of Sudan ) • Generation Capacity: 8 units with total capacity 320MW. • Construction period 5 years. • Feasibility Study: Completed • .Estimated Cost = 542 Meuro • . 0

  5. Kajbar Dam 0 Location : 120 km north the city of Dongola. Generation Capacity: 360 MW (6X60MW) Kaplan type. Project Status: Feasibility Study Completed. Estimated Cost = 894 MUS$

  6. Shereik Dam Location : on the 5th Nile cataract. Generation Capacity: 420 MW (6X70MW) Kaplan type. Project Status : Feasibility Study Completed. Estimated Cost = 898 MUS$ 0

  7. Rosaries Hydro Power Plant Upgrading • The Current Condition :- • 7 Units with total capacity 280 MW • To be Upgraded to : 442 • Feasibility Study Available . • Estimated Cost = 170 MUS$

  8. THERMAL POWER Red Sea Coal Fired Power plant Project Location: Red sea state in eastern Sudan - north of Port Sudan Generation Capacity : Coal Power Plant 2 X 300 MW Plant fuel type: coal Project contract type : turnkey project. Project Status : Feasibility Study Completed Estimated Cost = 0.9 BUS$

  9. Red Sea Combined Cycle Project • 1500 MW ( 1000 MW Gas Turbines & 500 MW Steam Turbines ) . • PROJECT STATUS : Site selected , Bankable Feasibility Study Completed , Ready for Funding . • Fuel type GAS ( Liquid Natural Gas - LNG ) • Estimated Cost = 1.2 BUS$ ( Including The Gas Terminal)

  10. Details of Red Sea Combined Cycle: • Block 1 CC:- • 2X 170 Siemens Gas Turbines i/p • 1X170 MW Steam Turbine + HRC Needed • Block 2 CC :- • 2X 170 MW Gas Turbine Needed . • 1X 170 MW Steam Turbine + HRC Needed • Block 3 CC :- • 2X 170 MW Gas Turbine Needed . • 1X 170 MW Steam Turbine + HRC Needed

  11. TRANSMISSIONKhartoum 500 KV Line Project Location: Khartoum RING Route Length: 260km OHTL – 500KV Line Substation: 3New substations 500/220/33 KV Feasibility Study Completed. Estimated Cost 300 MUS$

  12. West Sudan 220 KV Transmission Lines Projects • South Kordofan = 60 KM. North Kordofan = 218 KM. • West Kordofan = 90 KM. • North Kordofan to Darfur = 552 KM. • Darfur Lines = 320 KM. • Total Estimated Cost = 1 BUS$ • All Feasibility Studies are Completed.

  13. Renewable Energy Wind Atlas Average wind speed 4.2 – 8.5 M/Sat 80 meters above ground level (agl) Areas with highest wind speed: Red Sea Northern Sudan (Dongola) Jabel Marra Mountains in western Sudan

  14. Renewable Energy Solar Atlas Average daily solar Irradiation: 5.8– 7.2 kWh/m2 The solar radiation increases in northern and west-northern areas and decreases towards the south

  15. 500 MW Solar Power Projects • Proposed Projects for IPP (BOOT,BOO,..) • 200 MW Omdurman Gomouia PV Solar PP. • 200 MW West Omdurman PV Solar PP. • 100 MW Elgobosh (River Nile State).

  16. 1250 MW Wind Energy Projects • Proposed Projects for IPP (BOOT,BOO,..) • All in Dongola Site (Northern State) . • 1st PP 250 MW. • 2nd PP 500 MW. • 3rd PP 500 MW .