Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa
Manual Mounting Chop off capacitor legs Mount capacitor Solder Automation Mount capacitor without cutting legs Soldering Cut off legs
@RIKEN @BNL Clamp Schedule Delivered to BNL
QA Plan Visual Inspection • Test Bench @ RIKEN Contacts (Sampling) Humidity Performance (Sampling)
PHENIX Requirement • Station2&3 Scaffold • Dry Air System • Compressor capacity • Pluming • Manifolds • Adapters
Station-2&3 Scaffold Simultaneously Install Station-2 terminators Access to Anode Area
PHENIX Dry Air Octant 7 3710 3710 3710 3711 3711 3711 20 branches/gap 40 branches/gap 3712 3712 3713 Manifold 3713
Installation Duration Unit : hour * per 4 clamps Installation Crews: IN(2), Yoshimitsu Imazu(4), Kentaro Watanabe(2), Yoshinori Fukao(2), New Senior Ph.D Student(2) Total (12) 10 weeks man 3 ~ 4 weeks 3man
To be addressed • Complete humidity test • Dry air test • Heat cycle test • Optimize coating