An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao (RIKEN) YoshimitsuImazu (RIKEN) Kentaro Watanabe (Rikkyo)

  2. MuTr Cross Talk HV (1800 V) Rise time of anode signal ~ 10 nsec Serious Issue for Big Pulse 100mV 1 MW Anode wire 3V Removed to reduce HV trips .... 100 pF ~0.1 pF/strip 1 MW Cathode strips (96 strip) Decap Doesn’t exist. Anode Readout Pointed out by Tsutomu Mibe@KEK

  3. Solution HV (1800 V) Rise time of anode signal ~ 10 nsec 1 MW Anode wire .... 100 pF ~0.1 pF/strip 1 MW R<<1M W Cathode strips (96 strip) Additional Circuit to let anode current escape to ground.

  4. MuTr Station-3 Anode Card To Anode Wire Pads for surface mount capacitors Left over Solder + Coating Capacitor (Removed)

  5. North Station-3 Anode Gap Geometrical Constraint 25mm 28mm Anode cards are only accessible from their back. Front pattern can only be visible using an inspection mirror.

  6. Mounting A Clamp on Anode Card 28mm Screw Capacitor Clamp Gap-2 Station-3 Anode Card Gap-1 Station-3 Anode Card Anode card Probe Pad MuID Side IP side Station-3 Chamber

  7. (A) 4 pin probes Recap Clamp Prototypes (B) single pin probe (C) ShinEtsu Rubber Co.:EC-BM300 (2.5Wcm) 半田の残りかす

  8. Advantage/Disadvantage of Different Prototypes Advantage Disadvantage

  9. Effect of Recap

  10. Test Bench Setup 90SrSource Strip#22 Anode wire w/ and w/o Clamp

  11. Strip# Comparison w/ .vs w/o Terminator w/o Clamp w/o Clamp 17 27 22 Trigger w/ Clamp w/ Clamp 17 27 22 Trigger

  12. Comparison w/ .vs w/o Clamp Conductive Rubber Average ADC [channel] With Clamp Strip Number w/o Clamp

  13. Towards Successful Installation

  14. Alignment Spacer determines Transverse direction within ~ 300mm. Fiber scope shot Possible misalignment can be found by visual inspection using a fiber scope Fiber Scope

  15. Electrical Contact Readout socket Electrical Contact will be confirmed by measuring Voltage using temporary readout tool. Readout Board To be removed after the measurement.

  16. Extreme Breathing Test HV=1900V Duration 2min

  17. Installation Proposal To be installed North Bottom Octants

  18. Summary • We have developed prototype clamps for re-capacitation to MuTr St-3. • Good Contact was established more than 90% channels with present design in North MuTr. • We propose to install 3 different prototypes (each 20) to North bottom Octants for Run11. • They can be uninstalled during Run if they cause trouble in HV operation.

  19. Backup Slides

  20. Event Display of ADC Distribution Gap 1 Stereo Gap 2 Stereo Gap 3 Stereo ADC MIP Gap 1 NonStereo Gap 2 NonStereo Gap 3 NonStereo MIP Strip