An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TC meetingP2 planning wks 5&6 A.Tauro 31-1-2012

  2. Planning wk5 1/2 • TPC capacitors + laser repair • TRD: LV investigation + Ethernet switches • SPD: put back and test SPD box (Mon 30/1) + drill filters • FMD: reinstall FMD2 box • T0: check fibers on detector (Mon. 17:00: remove T0 protection) • P2 tech: evacuation path SR5 (baby-frame) + L3 ladder + racks CR3 (Sat  no access low-beta) + L3 ventilation (Fri, put elbow) + vacuum-cleaning above MCTS + fix EMCal cable (Wed PM) • PMD maintenance • Remove V0-FMD1  no longer needed • Muon TRK: • Repair slats on ST3-ST4-ST5 • A.Saba –Thu-Sat

  3. Planning wk5 2/2 • PH-DT: spare line for new TPC gas mixture (Wed stop Ar from 10:00 – 12:00) • TE-VSC: start pumping down central beampipe (Feb.2nd) • GS-ASE: sniffer maintenance • EN-EL: Optical fiber installation CR1 and CR2 (Tue) • EN-CV-DC: maintenance TPC-RR and ITS cooling plants (start on Feb.3rd) • EN-CV: Replacement CR3 racks + removal air conditioning CR2-3-4 + dry column test (2nd Feb) + cabling ITS ventilation unit + connection new pipe to existing one in CR5 (Mon AM) • BE-ABP-SU: survey TRD modules, CAL frame photogrammetry, MNF valve, MNF, SF deformation, TPC feet • EN-HE: 30th Jan. UX25 crane inspection by Brunnhuber • INEO: Ethernet cables (TRD-TPC) + connect new PHOS pump to UPS

  4. Planning wk6 • TPC capacitors + check the loops for the thermal screen • PMD maintenance • Muon TRK: • Repair slats on ST3-ST4-ST5 • TE-VSC: pump-down central beampipe (cont.) • GS-ASE: maintenance gas detection (UX, CR5) • EN-CV-DC: maintenance ITS cooling plant • Transport + P2tech: • Mon: repair roller L3 door • Tue-Wed: close and bolt L3 doors  no access L3 + ramp-up B-field (10’, Tue or Wed PM) • Thu: reinstall ventilation  no access L3 • Fri: reinstall green bridges • EN-CV: restart L3 and PMD ventilator units (Thu-Fri) • BE-ABP-SU: survey MTK ST1-2 • EN-HE-LM: lift maintenance • UX: no access Wed from 7:00 to 9:00 • CRs: no lift Wed from 9:00 to 11:00