Hazlehurst Substation CI Agent Boom Installation

Hazlehurst Substation CI Agent Boom Installation. SITE SUMMARY. Amount of CI Agent Boom Installed 225’ Tools Used Shovel, Bob Cat, Rake, Pick.

kiri
Download Presentation

Hazlehurst Substation CI Agent Boom Installation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hazlehurst Substation CI Agent Boom Installation

  2. SITE SUMMARY • Amount of CI Agent Boom Installed 225’ • Tools Used Shovel, Bob Cat, Rake, Pick

  3. Step 1 & 2: CI Agent 12” Boom Install1: A 3” deep trench is created along the fence lineNote: Water drains toward this fence2: Lay Out the boom along the trench

  4. Step 3 & 4: CI Agent 12” Boom Installation3: Stand the boom upright with the metal grommets at the top4: Attach the boom to the fence using aluminum fence ties

  5. Step 5:CI Agent 12” Boom Installation5: Fill the 3” trench with dirt around the boom to grade Note: This leaved 9” of the boom above ground)

  6. Step 6 & 7: CI Agent 12” Boom Installation6: Place gravel on the front side of the boom roughly even with the top of the boom. (At this site the gravel was 8” tall & 12” wide)7: Place gravel on the back side of the boom roughly even with the top of the boom. (At this site the gravel was 8” tall & 4’ wide)

  7. Finished Site