TE EPC. EPC contribution to the Booster LIU TDR. EPC Project Meeting 06-09-2011 Serge Pittet. HPC. TE EPC. Refine activity weight, start end end dates on each sub-item. Define technical responsible(s) for the TDR phase . Prepare a fellow request.
E N D
TE EPC EPC contribution to the Booster LIU TDR EPC Project Meeting 06-09-2011 Serge Pittet
HPC TE EPC • Refine activity weight, start end end dates on each sub-item. • Define technical responsible(s) for the TDR phase. • Prepare a fellow request. • Refine technical baseline for the MPS and trims. • Define B-field regulation requirements with TE-MSC (M.Buzio). • Start civil engineering study with GS/SE. • Study with TE/MSC (A.Newborough) an alternative with new low resistance magnets and smaller MPS. Compare investment and running costs. TE-EPC - Serge Pittet
FPC TE EPC • Refine activity weight, start end end dates on each sub-item. • Define technical responsible(s) for the TDR phase. • Refine technical baseline for all WUs. • Follow with TE/ABT (J.Borburgh) the design of the PS injection. TE-EPC - Serge Pittet
LPC TE EPC • Continue project follow-up • Refine activity weight, start end end dates on each sub-item. • Define technical responsible(s) for the TDR phase. • Follow with AB/OP (G.Metral) the design of the PS injection. • Study FGC3 and REGFGC3 integration in the Canada power supplies. • Optimize transfer lines upgrade strategy with TE/MSC (A.Newborough) and TE/EPC/MPC TE-EPC - Serge Pittet