1 / 4

EPC contribution to the Booster LIU TDR

TE EPC. EPC contribution to the Booster LIU TDR. EPC Project Meeting 06-09-2011 Serge Pittet. HPC. TE EPC. Refine activity weight, start end end dates on each sub-item. Define technical responsible(s) for the TDR phase . Prepare a fellow request.

kizzy
Download Presentation

EPC contribution to the Booster LIU TDR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TE EPC EPC contribution to the Booster LIU TDR EPC Project Meeting 06-09-2011 Serge Pittet

  2. HPC TE EPC • Refine activity weight, start end end dates on each sub-item. • Define technical responsible(s) for the TDR phase. • Prepare a fellow request. • Refine technical baseline for the MPS and trims. • Define B-field regulation requirements with TE-MSC (M.Buzio). • Start civil engineering study with GS/SE. • Study with TE/MSC (A.Newborough) an alternative with new low resistance magnets and smaller MPS. Compare investment and running costs. TE-EPC - Serge Pittet

  3. FPC TE EPC • Refine activity weight, start end end dates on each sub-item. • Define technical responsible(s) for the TDR phase. • Refine technical baseline for all WUs. • Follow with TE/ABT (J.Borburgh) the design of the PS injection. TE-EPC - Serge Pittet

  4. LPC TE EPC • Continue project follow-up • Refine activity weight, start end end dates on each sub-item. • Define technical responsible(s) for the TDR phase. • Follow with AB/OP (G.Metral) the design of the PS injection. • Study FGC3 and REGFGC3 integration in the Canada power supplies. • Optimize transfer lines upgrade strategy with TE/MSC (A.Newborough) and TE/EPC/MPC TE-EPC - Serge Pittet

More Related