1 / 12

Shelter Cluster Region VIII

Shelter Cluster Region VIII. SUB – HUB: GUIUAN Eastern Samar and Marabut As of 06/01/2014. Tent Actors and Numbers. ESK Actors and Numbers. ESK ( distributed+pipeline ) considered sufficient; recommendation is to phase out tarp and tent and scale up recovery shelter. NFI Actors and Kits.

kreeli
Download Presentation

Shelter Cluster Region VIII

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Shelter Cluster Region VIII SUB – HUB: GUIUAN Eastern Samar and Marabut As of 06/01/2014

  2. Tent Actors and Numbers

  3. ESK Actors and Numbers

  4. ESK (distributed+pipeline) considered sufficient; recommendation is to phase out tarp and tent and scale up recovery shelter

  5. NFI Actors and Kits

  6. NFI Actors and Kits • ICRC – EHI (kitchen set, blankets, mats, buckets, jerry cans, hygiene kits) • SOS Attitude/MSF – lux kits, generators, lighting, kitchen sets, hygiene sets – islands and selected Barangays identified for high need • UNHCR – blankets, jerry cans, coming per request/gap-filling • IOM – buckets, jerry cans, kitchen sets, mats, blankets, per request/gap filling • UNHCR/IOM – solar lamps and radios • ACTED – Hygiene kits • Citizens’ Disaster Response Center (CDRC), with support from Peace Winds Japan – blankets, bed sheets and hygiene kits

  7. Debris to Shelter Actors • IOM (began chainsaw operation in Guiuan last week of December, table saws began in the first week of January) • ICRC (end January) • ACTED (cash injections end January) • Plan (component of ESK – under study) • Oxfam (cash injections currently in Mercedes) • CRS? • Requirements for exploitation of coco-lumber: • Permit from PCA (Borongan) • Registration of saws with PCA (Borongan) • Agreement with LGU (municipalities and barangays) to ensure liaison and agreement with private landowners if applicable

  8. Recovery Shelter

  9. Recovery should be starting now but ESK is still in pipeline for many – need to push for Recovery packages and coordinate with actors and livelihood options (like MSF boat kits)

  10. Shelter Designs • CRS using A-Frame design for ESK that can be modified and adapted to use with CGI • IOM will design “open house” using basic kit and coco lumber for roofing frame – for use in DRR/BBB training • No other designs at this time, actors are requested to submit designs to SC FP/TAC to make sure that we have measure of equality

  11. Other Issues • Tarpaulins – SC FP assesses that there are more than 2 tarpaulins available for all 50,000 HH in the target area; not a hard stand-down, but recommend more recovery and less tarpaulins (tools and fixings still necessary) for shelter • Education/WASH/Distribution – need for tarpaulins for other sectors, in particular distribution points if possible and for school rehabilitation (guidance from SC Manila Required) • SC needs to be involved in Relocation Site planning and action if/when IDPs from Camps/ECs/Bunkhouses are given land • Coordination of bunkhouses is handled by CCCM Cluster

More Related