1 / 8

Dennis Rossmann

Dennis Rossmann. P .P .G .S. P.P.G.S. Risk !!! Client Contractor. P.P.G.S. Contractors Risk Product Performance External Influences. P.P.G.S. External Influences Supporting layers (Surfacing only) Traffic growth! Traffic loading External Influences. P.P.G.S.

kylia
Download Presentation

Dennis Rossmann

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dennis Rossmann P .P .G .S

  2. P.P.G.S Risk !!! • Client • Contractor

  3. P.P.G.S Contractors Risk • Product Performance • External Influences

  4. P.P.G.S External Influences • Supporting layers (Surfacing only) • Traffic growth! • Traffic loading • External Influences

  5. P.P.G.S Supporting layers!

  6. P.P.G.S Traffic growth

  7. G.C.M. Number vehicles limited to 56+ 12 849 Number of vehicles overloaded 3994 (11%) Average overload 1300 kg (2%) Average prosecuted overload 2792 kg Maximum overload 15 300 kg (27%) P.P.G.S Traffic Loading (Overload) PMB 2002 Report

  8. P.P.G.S Traffic / Loading (Overload) What should contractor expect???

More Related