An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Impact Evaluation Experiences from the Field Sebastian Martinez Impact Evaluation Cluster, AFTRL

  2. Some Field Experiences Complete (Stages 1-6) • Piso Firme (Housing in Mexico) • Iniciamos Tu Casa (Housing in Mexico) • Mejoramos Tu Casa (Housing in Mexico) • Juventud y Empleo (Youth Training in DR) Baseline (Stages 1-4) • Educacion Inicial (ECD in Mexico) • Plan Nacer (Health Insurance in Argentina) Design (Stages 1-3) • About 10 evaluations in design or baseline stage

  3. Impact Evaluation “Life Cycle”

  4. Timing & Planning • Impact evaluation design during program design • Baseline survey in the field before program implementation • Exposure period • long enough for results • short enough for politics • Follow up survey in the field before implementation in Control areas • Schedule: work backwards from date results are needed

  5. Impact Evaluation Team Design and implement evaluation with: • TTL & Project team • Government counterparts • Other key selected players (donors, NGOs, etc.) • Impact evaluation experts • Data collection agency

  6. Budget • Data collection • Consultants • Staff time Financing • Allocate project baseline and ex-post evaluation to IE • Trust Fund money • Piggy back on ongoing data collection

  7. A few thoughts… • Design evaluation at same time as project • Get key stakeholders onboard • Operations: build an explicit IE team, timeline • Monitor project implementation • Be prepared for delays • Long run benefits far outweigh short term costs