1 / 8

October 2011

October 2011. Elk Point Basin. WPX Milestone Project. WPX Manitoba Project. Milestone Saskatchewan. Milestone Timeline. Present. Scoping Study Highlights. (NPV 10 ) 5.22 Bn 1 CAD: IRR 27.3 %* 1. CRU Projected prices ($ 511) P roduction rate of 2.5 Mt per year 40 year mine life

lani
Download Presentation

October 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. October 2011

  2. Elk Point Basin WPX Milestone Project WPX Manitoba Project

  3. Milestone Saskatchewan

  4. Milestone Timeline Present

  5. Scoping Study Highlights • (NPV10) 5.22 Bn1CAD: IRR 27.3%* • 1. CRU Projected prices ($511) • Production rate of 2.5 Mt per year • 40 year mine life • Total CAPEX $2.51 billion CAD • 8.5% Reduction of production costs • due to the high formation temperatures AMEC’s EPCM experience with five Potash Corp mines adds credibility to the CAPEX estimates for this project.

  6. PFS Highlights

  7. Geothermal Gradients

  8. Annual Earning Comparisons * Gate Price excludes shipping to market ( $360/T KClf.o.b.Vancouver)