An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LMS Subcommittee of the Distance Learning Committee Mr. James Brittain Dr. Diane Boze Dr. Richard Castillo Dr. Kimberly Cottrell Dr. Steven Dunker Mr. Kip Finnegan Ms. Barbara Fuller Mr. Michael Gibbons Mr. Will Gillen Ms. Peggy Kaney Dr. Tim McElroy Mr. Tom Messner Ms. Allie Ogle Dr. Kathleen Reese Ms. Elizabeth Reeve Dr. Erik Terdal Ms. Stacy Thompson Dr. Joyce Van Nostrand Dr. Joan E Williams LMS Open House

  2. Current ConditionsOnline Course Information • 94 Courses • 132 Sections • 2135 Students • 3600 Enrollments Fall 2006 – Summer 2007 Data

  3. Current ConditionsHardware and Software Information • Single Server No Redundancy Nearing Capacity • Basic Version of Bb • No single sign on • No add on capabilities • Feature stunted

  4. Future Direction • Online degree programs • 24/7/365 Uptime • Expanded features and options • Must import/convert existing courses seamlessly • Enterprise capabilities • Scale to allow greater numbers of students • Redundancy • Additional Features

  5. Process For Change 1. Form a core selection team (Done) 2. Agree to process (Done) 3. Define (and agree upon) criteria for a learning management system (January) a. Collect Information (i.e. surveys) b. Face-to-Face Discussions.

  6. Process 4. Match the requirements to vendors (February)a.            CoIT recommendationsb.            WCET EduTools – LMS comparison site 5.            RFP (February)6.            Select finalists (March)7.            Demos (March)8.            Pilot or hands-on tests (April)9.            Vote to select (May, 2008)

  7. Discussion