110 likes | 188 Views
Agenda - Wednesday. PWE3 - Thursday, November 12, 2009 13:00 - 15:00 CHAIRS: Stewart Bryant and Matthew Bocci 15 min - WG Status - Stewart Bryant and Matthew Bocci 10 min - P2MP PW Accounting Extensions - Bo Wu
E N D
Agenda - Wednesday PWE3 - Thursday, November 12, 2009 13:00 - 15:00 CHAIRS: Stewart Bryant and Matthew Bocci 15 min - WG Status - Stewart Bryant and Matthew Bocci 10 min - P2MP PW Accounting Extensions - Bo Wu http://tools.ietf.org/id/draft-wu-pwe3-p2mp-pw-accounting-extensions-00.txt 10 min - Pseudowire (PW) Redundancy - Praveen Muley http://tools.ietf.org/html/draft-ietf-pwe3-redundancy-bit-02.txt http://tools.ietf.org/html/draft-ietf-pwe3-redundancy-02.txt 10 min - Flow Aware Transport of Pseudowires over an MPLS PSN - Stewart Bryant http://tools.ietf.org/html/draft-ietf-pwe3-fat-pw-02 10 min - Packet Pseudowire Encapsulation over an MPLS PSN - Stewart Bryant http://tools.ietf.org/id/draft-bryant-pwe3-packet-pw-02.txt 10 min - Control Word Reserved bit for use in E-Tree - Fred Jounay for Simon Delord http://tools.ietf.org/id/draft-delord-pwe3-cw-bit-etree-00.txt 10 min - Signaling Root-Initiated Point-to-Multipoint Pseudowires using LDP - Luca Martini http://tools.ietf.org/html/draft-martini-pwe3-p2mp-pw-01.txt (Note: (results of merging draft-martini-pwe3-p2mp-pw-00 and draft-jounay-niger-pwe3-source-initiated-p2mp-pw-03 ) 5 min - Closing - Stewart Bryant and Matthew Bocci
Agenda - Friday PWE3 - Friday, November 13, 2009 9:00 - 11:30 (MPLS-TP - joint with MPLS WG) CHAIRS: Stewart, Matthew, George and Loa as appropriate 10 min - LDP Extensions for MPLS-TP PW OAM configuration - Fei Zhang http://tools.ietf.org/html/draft-zhang-mpls-tp-pw-oam-config-00
PWE3 WG StatusIETF-76 Stewart Bryant stbryant@cisco.com Matthew Bocci Matthew.Bocci@alcatel-lucent.com
RFC • An Architecture for Multi-Segment Pseudowire Emulation Edge-to-Edge (RFC 5659)
RFC Editor • draft-ietf-pwe3-mpls-transport-04.txt • draft-ietf-bfd-base NOT-RECEIVED • draft-ietf-mpls-rsvp-te-no-php-oob-mapping NOT-RECEIVED • draft-ietf-pwe3-vccv-bfd IN-QUEUE • draft-ietf-pwe3-vccv-bfd-07.txt • draft-ietf-bfd-base NOT-RECEIVED • draft-ietf-bfd-generic IN-QUEUE • draft-ietf-bfd-v4v6-1hop IN-QUEUE
With the IESG • draft-ietf-pwe3-cep-mib • Revised ID Needed • Chairs need to chase editors • draft-ietf-pwe3-segmented-pw • Revised ID Needed • Significant number of DISCUSS
Work in Progress 1 • draft-ietf-pwe3-oam-msg-map-11.txt Finished LC, revised draft expected soon • draft-ietf-pwe3-dynamic-ms-pw-10.txt • draft-ietf-pwe3-congestion-frmwk-02.txt • draft-ietf-pwe3-redundancy-bit-02.txt On agenda • draft-ietf-pwe3-redundancy-02.txt On agenda
Work in Progress 2 • draft-ietf-pwe3-p2mp-pw-requirements-01.txt Is this ready to LC? • draft-ietf-pwe3-ldp-aii-reachability-02.txt • draft-ietf-pwe3-mpls-eth-oam-iwk-01.txt • draft-ietf-pwe3-iccp-02.txt • draft-ietf-pwe3-fat-pw-02 - On Agenda • draft-ietf-pwe3-fc-encap-09.txt & draft-ietf-pwe3-fc-flow-00.txt - Comments sent to authors - waiting revised drafts
Poll for WG draft • draft-martini-pwe3-p2mp-pw-01.txt • draft-martini-pwe3-static-pw-status-02.txt • Currently references MPLS-TP • MPLS-TP will determine applicability of this mechanism to TP, so reference should be removed Send yes/no to list by 22nd Nov.
MPLS-TP • Mead team was closed and work of MEAD team moved to IETF WGs (MPLS, PWE3, CCAMP, L2VPN). • Tuesday 4pm UK calls to progress work – co-ordinates announced on MPLS-TP list. • Friday PWE3 session will be shared with MPLS WG to work on MPLS-TP.
PWE3 and MPLS-TP • There are questions about the architectural relationship between PWE3 and MPLS in the MPLS-TP project. • In particular the applicability of MS-PW to MPLS-TP. • We believe this is now clarified in the context of the client – MPLS-TP description that is needed in draft-ietf-mpls-tp-framework • Authors intend to provide an update in the MPLS-TP PWE3 session on Friday