GRANT AMENDMENTS

GRANT AMENDMENTS. PROCESSES & PROCEDURES. WHEN REQUIRED. Program Amendments (Ch. 3, Section 9) You must receive formal DCA Approval to… Add a new activity or delete an approved activity Increase or decrease scope of activity by 10% or more

latoya
Download Presentation

GRANT AMENDMENTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GRANT AMENDMENTS PROCESSES & PROCEDURES

  2. WHEN REQUIRED Program Amendments (Ch. 3, Section 9) • You must receive formal DCA Approval to… • Add a new activity or delete an approved activity • Increase or decrease scope of activity by 10% or more • Propose activity in area other than approved CDBG Target Area • Transfer funds from one activity to other greater than 10% of grant amount • DCA will consider effect on match/leverage • If proposed change is substantial, you must hold another public hearing September 5-6, 2013

  3. ADDING / DELETING ACTIVITY EXAMPLES: • Adding Acquisition when not part of original grant • Adding Engineering/ Architect fees when initially the local government was paying • Deleting Water from a Streets/Drainage & Water grant September 5-6, 2013

  4. DECREASE IN EXCESS OF 10% COULD BE ANY OF THE FOLLOWING: • 10% of beneficiaries • 10% of the size of the building • 10% of the amount of water/sewer lines to be installed • 10% of the houses to be rehabilitated/ reconstructed September 5-6, 2013

  5. WORK IN OTHER AREAS COULD BE ANY OF THE FOLLOWING: • Extending water/ sewer lines outside target area with remaining funds • Rehabilitation of house(s) outside original target area • Change of use of building built with grant funds September 5-6, 2013

  6. TRANSFER OF FUNDS Any transfers between approved line items in excess of 10% of grant award requires an amendment For most grants, this will be transfers in excess of $50,000 (assuming $500,000 grant) September 5-6, 2013

  7. PROCESS • First – discuss with your CDBG Field Rep. • Second – discuss with DCA • Third – after verbal approval, submit required documentation (See manual, Ch. 3, Section 9) • Fourth – if amendment is determined by DCA to be “substantial” then hold public hearing September 5-6, 2013

  8. REQUIRED DOCUMENTS REVISED NARRATIVES/ADDITIONAL DOCUMENTATION • DCA-4 & 5 • Provide a narrative that describes the need for the amendment and discusses the plan of action • Letter from engineer explaining the need and plan of action and providing a cost estimate • Map September 5-6, 2013

  9. REQUIRED DOCUMENTS • Public Hearing documentation, if amendment is determined to be substantial • Other Revised Forms • DCA-2 • DCA-6 • DCA-7 • DCA-8 • Environmental may need updating. • An amendment is a “mini” application September 5-6, 2013