APUL CP Status

APUL CP Status. Sandor Feher Fermilab. Hibernation Plan expenditure. Status. Tom and Fred has a minimum amount of work to perform. Jeff still need to finalize the upper end mockup of the CL fabrication and test.

lee
Download Presentation

APUL CP Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APUL CP Status Sandor Feher Fermilab

  2. Hibernation Plan expenditure

  3. Status • Tom and Fred has a minimum amount of work to perform. • Jeff still need to finalize the upper end mockup of the CL fabrication and test. • The cable splice test was a great success however we have discovered an interesting feature of the insulation scheme which might need further investigation. It probably requires an additional test. Even with an additional test we will not overrun the allocated budget.

More Related