1 / 16

Prosedur Penulangan Pelat

Prosedur Penulangan Pelat. Nur Ahmad Husin. Pengantar. Fakta. Konsep. Ringkasan. Latihan. Asesmen. Pengantar. Fakta. Pengantar. Konsep. Ringkasan. Latihan. Asesmen. Fakta. Konsep. Pengantar. Fakta. Ringkasan. Latihan. Asesmen. Konsep.

Download Presentation

Prosedur Penulangan Pelat

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prosedur Penulangan Pelat Nur Ahmad Husin

  2. Pengantar Fakta Konsep Ringkasan Latihan Asesmen Pengantar

  3. Fakta Pengantar Konsep Ringkasan Latihan Asesmen Fakta

  4. Konsep Pengantar Fakta Ringkasan Latihan Asesmen Konsep • Diketahui atau direncanakan data-data perencanaan meliputi : • Mutu beton pelat (fc’) • Mutu baja (fy) • Ukuran panel pelat (b x h) • Tebal rencana pelat (lihat persamaan 6.1, 6.2 dan 6.3) • Fungsi bangunan • Tentukan type pelat, • apakah tergolong pelat 1 arah ataukah pelat 2 arah berdasarkan perbandingan sisi panjang terhadap sisi pendek panel pelat. • Hitung Mlx, Mly, Mtx dan Mty (lihat tabel 6.1 dan 6.2)

  5. Konsep Pengantar Fakta Ringkasan Latihan Asesmen Konsep

  6. Konsep Pengantar Fakta Ringkasan Latihan Asesmen Konsep

  7. Konsep Pengantar Fakta Ringkasan Latihan Asesmen Konsep

  8. Konsep Pengantar Fakta Ringkasan Latihan Asesmen Konsep

  9. Konsep Pengantar Fakta Ringkasan Latihan Asesmen Konsep • Hitung •  = 0,80 b = 1000 mm • atau (min) = 1,3 x (analisis) • Hitung • Hitung As =  x b x d

  10. Konsep Pengantar Fakta Ringkasan Latihan Asesmen Konsep

  11. Pengantar Fakta Konsep Ringkasan Latihan Asesmen Ringkasan • Bedakan apakah tumpuan balok apakah tergolong jepit penuh atau jepit elastis bergantung pada besaran dari balok sekelililingnya. • Tulangan lentur terpasang

  12. Latihan Pengantar Fakta Konsep Ringkasan Asesmen Latihan Rencanakan penulangan Panel 2 pada contoh 6.1 apabila dipakai mutu beton (fc’) = 22,5 Mpa dan mutu baja (fy) = 240 Mpa dengan asumsi panel pelat tersebut akan digunakan sebagai ruang perkuliahan. Adapun ukuran panel pelat 7,5x6 m2 dan tebal pelat rencana 13 cm. Berat jenis beton 2400 kg/m3. Penyelesaian : Perhitungan pembebanan • Beban mati: 0,13 x 2400 = 312 kg/m2 3 x 21 = 63 kg/m2 2 x 24 = 48 kg/m2 qD = 423 kg/m2 Beban hidup : qL = 250 kg/m2 Sehingga diperoleh : Q(ult) = 1,2(qD) + 1,6(qL) = 1,2(423) + 1,6(250) = 907,6 kg/m2

  13. Latihan Pengantar Fakta Konsep Ringkasan Asesmen Latihan • Adapun type pelat adalah, tergolong pelat 2 arah • Untuk perhitungan gaya dalam mengacu ke dalam tabel 7.1 (Asumsi perletakan jepit penuh pada keempat tepinya) Mulx = +0,001.q.lx2 .X = 0,001.(907,6).(6)2 .(29,5) = 963,9 kgm Muly = +0,001.q.lx2 .X = 0,001.(907,6).(6)2 .(19,5) = 637,1 kgm Mutx = -0,001.q.lx2 .X = 0,001.(907,6).(6)2 .(66,5) = -2172,8 kgm Muty = -0,001.q.lx2 .X = 0,001.(907,6).(6)2 .(56,5) = -1846,1 kgm

  14. Latihan Pengantar Fakta Konsep Ringkasan Asesmen Latihan • Perhitungan penulangan Mutx = 21.728.000 N-mm dx = 130 – 20 – 10/2 = 105

  15. Latihan Pengantar Fakta Konsep Ringkasan Asesmen Latihan • Perhitungan kebutuhan tulangan As = 0,011 x 1000 x 105 = 1155 mm2 Pasang D13 – 100 mm Perhitungan kebutuhan tulangan Mty, Mlx dan Mlyequivalen dengan proses perhitungan diatas

  16. Asesmen Pengantar Fakta Konsep Ringkasan Latihan Asesmen