WP5. JRA1 Testbed Management Technologies. ETICS2 first Review. Alain Roy. University of Wisconsin-Madison (USA). Bruxelles, 3 April 2009. Contents. Goals Major Achievements Challenges Metrics and Statistics Conclusions. 3. Goals. Goals. Top-level Goals:
E N D
WP5 JRA1 Testbed Management Technologies ETICS2 first Review Alain Roy University of Wisconsin-Madison (USA) Bruxelles, 3 April 2009
Contents • Goals • Major Achievements • Challenges • Metrics and Statistics • Conclusions WPX WP name
WPX WP name 3 Goals
Goals • Top-level Goals: • Designing and implementing solutions for resource and job management across the grid on IPv4 and IPv6 networks. • Explore existing hardware virtualization techniques, in order to integrate them into ETICS. • Deliverables due so far: • Job Management Web Service Interface Specification • IPv6 Compliance Analysis • Integration of Virtualization Technologies (Prototype) • Upcoming Deliverables: • Job Management Web Service Implementation • Integration of Virtualization Technologies • IPv6 Compliance • Other: • Support job submission to non-Condor systems (In support of DSA 2.4) WPX WP name
Other Goals • Cross-Site job submissions • Ability to share jobs between ETICS instances. WPX WP name
WPX WP name 6 Major Achievements
Achievements • DJRA 1.1: We have completed the specification of the web interface for Metronome. • DJRA 1.2: We have completed the IPv6 compliance analysis. • The analysis was the easy part. • The compliance is the hard part… More when we discuss “challenges” • DJRA 1.3: While this deliverable has been achieved, it needs considerable refinement and work in order to achieve the full implementation • Remote job submission: Successfully prototyped and nearly in production WPX WP name
DJRA 1.3: Virtualization Prototype • Two approaches explored • Use of Condor’s Virtual Machine Universe • Pushes management to Condor • Upper levels do no need to understand VM instantiation • Remote bootstrapper • (Explored at CERN) • Instrument Metronome to allow startup of virtual machine • Prototype in progress: complete by May 2009 WPX WP name
WPX WP name 9 Metrics and Statistics
Metrics and Statistics • I’m not sure what I should put here. • Can someone provide some guidance? WPX WP name
WPX WP name 11 Challenges
Challenge: Progress on Virtualization • To date, we have been slow on progress towards use of virtualization technologies • We believe that we can accomplish our deliverables during the ETICS 2 project. WPX WP name
Challenge: IPv6 Compliance • We have completed our IPv6 compliance analysis, and there are two major obstacles to achieving a pure IPv6-ready implementation. • ETICS relies on Metronome, which relies on Condor, and Condor is not IPv6 ready. The Condor project has requested funding for IPv6 compliance and is likely to get it, but it is unlikely to be completed before the end of ETICS 2. (The funding will not be received for a while) • Metronome relies on MySQL which is not IPv6 compliant. Switching to a new database is feasible but non-trivial. We are not aware of MySQL plans for IPv6 compliance. • Do we need to rely on a bridge/tunnel solution for now? WPX WP name
WPX WP name 14 Conclusions
Conclusions • Remote job submission is nearly production-ready • IPv6 Compliance faces challenges best dealt with by people outside the project • Virtualization is a bit behind, but we expect to complete it. WPX WP name