1 / 32

National Food Security Mission Uttarakhand

National Food Security Mission Uttarakhand. 11 th Meeting of NFSM-EC Dated 15 Jan 2013,Time 3-30 P.M. Venue: Krishi Bhawan , NEW DELHI. Land Use pattern in Uttarakhand. Total Reported Area – 56.72 Lakh ha. Land Use Statistics Year: 2009-10.

lorne
Download Presentation

National Food Security Mission Uttarakhand

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National Food Security Mission Uttarakhand 11th Meeting of NFSM-EC Dated 15 Jan 2013,Time 3-30 P.M. Venue: KrishiBhawan , NEW DELHI

  2. Land Use pattern in Uttarakhand Total Reported Area – 56.72 Lakh ha.

  3. Land Use Statistics Year: 2009-10

  4. Crop wise comparative productivity….quintal/ha

  5. Crop wise comparative productivity….quintal/ha

  6. Crop wise production estimates 2012-13….lakh m.t.

  7. Amount in Lakh Rs. As on 31.12.2012

  8. Financial Statement under NFSM------Rs in lakh

  9. Progress of NFSM-Rice (2012-13)

  10. Progress of NFSM-Wheat (2012-13)

  11. Major focus given by the States This is the first year (2012-13) of initiating of the NFSM programme in the State. Kharif programmes could not be managed properly as the approval of the programme was received after sowing of rice in hilly areas, even this, the following steps have been taken to accelerate the production programme. • Training and awareness campaigning from State to Nyaya Panchayat level. • Cluster demonstrations. • Hybrid rice demo in 82 ha. • Promotion of use of Laser land levelers (distribution of 28 out of 25). • Soil Health Management with area coverage of 32 thousand ha under micro nutrients. • Surveillance of pest and diseases on crops with area coverage 21 thousand ha under Plant Protection measures.

  12. Machinery Distribution- Distt. US Nagar

  13. Cluster Demonstration- NFSM Rice, Distt. Udham Singh Nagar

  14. Cluster Demonstration- NFSM Rice, Distt. Almora

  15. Distribution of Laser Leveller under NFSM, Distt. Haridwar

  16. Cluster Demonstration (Hybrid Rice 6444), Village- Lal Chandwala, Disrict Haridwar DISTRICT HARIDWAR

  17. Cluster Demonstraion of Rice: Inspection by GoI Team at Village- Mundlana, Block- Narson, Haridwar

  18. Cluster Demonstration of Hybrid Rice (PA-6444): Inspection by National Monitor Team, GoI at Village- Gaindikhata, Block- Bahadrabad, Haridwar

  19. Cluster Demonstration of Narendra-359: Inspection by National Monitor Team, GoI at Village- Tatwala, Block- Bahadrabad, Haridwar

  20. Training under NFSM: GOI Officers also Participated at Village- Alabalpur, Block- Laksar, Haridwar

  21. Power Weeder Distribution: 1. Sh. Rajendra Singh, Village- Badgaon, Block- Takula, Almora2. Sh. Narayan Singh, Village-Byalkhalsa, Block- Takula, Almora3. Sh. Manoj Rautela, Village- Kharhisunar, Block- Takula, Almora

  22. Application of Micro-Nutrients in Block Chaukhutia, Almora Cluster Demonstrations in Block Chaukhutia, Almora

  23. A3P Programme under NFSM Programme is not approved for Uttarakhand. Physical and financial progress under 19+ million tons pulse programme. Only Rs 3. lakh are allotted for micro irrigation. This component is already under the National Mission on Micro Irrigation

  24. Appointment of Project Management Team (PMT) in Districts In the meeting of State level NFSM-EC, it is decided to appoint students of Agriculture Universities as internship.

  25. Status of online submission of progress Report at State/District level Being the first year of the programme, online reporting is yet to start. Concurrent Evaluation of NFSM Being the first year of the programme, concurrent evaluation work is not yet undertaken.

  26. Specific Issues and suggestions • Savings of NFSM- rice is proposed for NFSM- Wheat. • Sowing of rice in hilly area of Uttarakhand starts from Mid March therefore, approval on the Work Plan is required in Feb for 2013-14 so that programme may be initiated well in time. • In case of hybrid rice clusters demonstration, the norms of the activities are same as for HYVs while the hybrid seed is much costlier than HYV seed. In this case a major portion of the investment will go to cost of seed. • Cost of Hybrid seed of rice is very high, assistance on seed subsidy is proposed @ 50% of the cost of hybrid seed. • Under the programme “Implementation of Special Plan to achieve 19+ million tones of pulse production during kharif 2012-13” only drip irrigation/sprinkler programme is approved for the State. Other activities in A3P should be considered for 2013-14.

  27. Issues • Uttarakhand is a hilly state and specially in hilly districts area under wheat and rice crop is less than 15000 ha as norms set under NFSM. Relaxation is required in crop coverage area norms from 15000 ha to 10000 ha. • Relaxation is required in basic qualifications and experience of technical consultants for deployment under the Project Management Team.

  28. SAP has already been prepared on the basis of Comprehensive District Agriculture Plan (C-DAP) • State and District level NFSM executive committees are organized for monitoring and review of the Scheme. • NFSM-Rice component : Identified district-5 (Haridwar, Pauri, USNagar, Almora & Pithoragarh) and the total cost of the NFSM – Rice is 1243.63 Lakhs. • NFSM–WheatComponent : Identified districts 8 (Haridwar, Dehradun, Pauri, Tehri, USNagar, Almora, Pithoragarh, & Nainital) and the total cost of the NFSM – Wheat is Rs. 948.46 Lakh.

  29. Thanks

More Related