An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit carries 1920 electrical channels. 50 feedthrough units in total (+5 spares) are required, 25 per endcap. There are 4 different kinds of signal feedthroughs on each endcap cryostat, due to the varied detectors they are servicing. In particular, low voltage is supplied to the HEC preamplifiers, located in the LAr, via signal feedthroughs. Close collaboration with colleagues from BNL (barrel signal feedthroughs) ATLAS reviews Project Review, BNL, Jun 12-13 1997 Baseline Design review CERN, Oct 13th 1997 Production Readiness Review, CERN, Jan 29th 1999 Activity/Systems Status Overview, CERN, Feb 11-12 2001 One endcap cryostat shown during assembly

  2. Ambient Flange Cold Flange 1920 channels to detector patch panels in the cryostat Bellows Bellows Seal Ring Cold Box or Funnel Pin Carriers VCR Glands Pigtail Cables Heater and T probes Bellows Cuff Ring CF Flange for tests Funnel cut here before welding on cold vessel bi-metallic junction Vacuum Cables Bolt Ring (not shown) to attach to warm vessel Seal ring OD = 326.4 mm Total height = 699.9 mm Endcap Signal Feedthrough Overview

  3. Production Status (as of June 10, 2002) 44 feedthrough units produced of which 29 at CERN and officially received. Production expected to end in August or September 2002 All units required for the endcap cryostat C are ready at CERN since March 2002 vacuum cable installation final cold tests

  4. Shipment to CERN crated feedthroughs first 4 HEC feedthroughs in shipping container at the University of Victoria(November 2, 2001) Each feedthrough has its own crate (they come in two sizes) 4 feedthrough crates are then packed together in a large container for shipment

  5. Reception Tests at CERN electrical tests leak tests • Feedthrough units are tested upon reception at CERN: • visual inspection • leak test (ambient temperature) • electrical test (cross-talk) • The electrical testing equipment will also be used on the cryostat after feedthrough installation

  6. Quality Assurance / Quality Control QA/QC is critical to the success of the project Very detailed document released (QA/QC version 5, March 28, 2002) • procedures and documents have been updated after the experience gained from building the first feedthroughs All TIS (CERN Safety) concerns have been addressed (Dec 00) All information stored in a purpose-built database • material traceability • production and reception test results • available on the web: http://particle.phys.uvic.ca/~web-atlas/atlas/feedthroughs/status/