100 likes | 230 Views
A summary on Polarisation in Run-13 for 255 geV. E.C. Aschenauer presenting the work done By Bill, DIMA and OLEG . 2012: H-Jet Results. H-Jet Results. polarisation for Blue and Yellow t o -calibration underway minimal impact on polarization, makes A N more stable
E N D
A summary on Polarisation in Run-13for 255 geV E.C. Aschenauer presenting the work done By Bill, DIMA and OLEG
2012: H-Jet Results 2013/03/13
H-Jet Results • polarisation for • Blue and Yellow • to-calibration underway • minimal impact on • polarization, • makes AN more stable • should be done by • tomorrow • next step calibrate pC 2013/03/13
pC Results • Caveat: not yet normalized to jet – simple reason need statistics • Note: • measured analyzing power for injection, 100GeV and 255 GeV in run 11/12 • have not seen an energy dependence of pC/H-jet normalization • can use the same normalization factor for flat top and injection • so injection measurements will be pretty accurate • fillsshown in all plots: 17085—17208 for B1 and Y1 Injection 2013/03/13
pC Results at flat top 2013/03/13
Hadron Polarisation for Experiments Account for beam polarization decay through fill P(t)=P0exp(-t/tp) growth of beam polarization profile R through fill pCarbon polarimeter Collider Experiments x=x0 correlation of dP/dt to dR/dt for all 2012 fills at 250 GeV • Polarization lifetime has consequences for physics analysis • different physics triggers mix over fill • different <P> 2013/03/13
pC Results: profile R at injection 2012: 0.054+/-0.0104 at flat top 2012: 0.133+/-0.009 2013/03/13
pC Results: profile R at injection 2012: 0.038+/-0.014 at flat top 2012: 0.205+/-0.011 2013/03/13
pC Results: Polarisation Decay 2012: -0.61+/-0.056 2012: -0.67+/-0.056 2013/03/13
Our Worries Target Death Rate • Use factor 2 thicker targets compared to 2012 • but still high death rate Fill Date Time Energy B1 B2 Y1 Y2 ----------------------------------------------- 17208 03/11 18:43 27 H5 17208 03/11 18:47 27 H2 17208 03/11 18:47 27 H4 17205 03/11 6:39 255 V5 17203 03/11 21:59 255 H1 H3 V3 17114 02/26 16:31 27 H6 17172 03/05 18:43 255 V5 17169 03/05 4:20 255 V3 H1 17134 03/01 23:33 255 V1 17121 02/27 18:55 27 V1 17209 03/12 05:08 255 V4 Remaining Targets: ================== B1: 0 horizontal and 6 vertical B2: 6 horizontal and 0 vertical Y1: 4 horizontal and 6 vertical Y2: 6 horizontal and 2 vertical Will have to replace targets at one of the next access