1 / 7

ASNN Strategic Direction 2012-2015

Organization and Program. ASNN Strategic Direction 2012-2015. Special Needs Unit project . Target: Advocacy and campaign for the implementation of education policy and disability policy, lobbying to provincial Ministers (2012-2015)

lyneth
Download Presentation

ASNN Strategic Direction 2012-2015

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Organization and Program ASNN Strategic Direction 2012-2015

  2. Special Needs Unit project Target: • Advocacy and campaign for the implementation of education policy and disability policy, lobbying to provincial Ministers (2012-2015) • 15 MOU for 15 special Needs units - between ASNN and Zonal Directors of Education (2012) • Mainstreaming of at least 10% of 236 children to regular school (20% for 2013-2015) • Provide centre and school-based vocational training to: 18 children ages 17&18 and 20 children ages 14 to 17 (2012)

  3. Special Needs Unit projectTeachers Training Target: • 24 training (reference; curriculum 2012) • Sign language training in collaboration with National disability Network in Sri Lanka (2012) • 2 Educational trip to best centres in Sri Lanka • Monitoring and internal evaluation (2012) • Project evaluation and impact assessment (by external evaluator 2012) • Implementation of ASNN accessibility minimum standard (2012-2015)

  4. Social Network Poverty Alleviation project Target: • Capacity building and expanding number of livelihood beneficiaries • Project monitoring and evaluation • Hiring of personnel to manage the project

  5. Social Network Target: • Establish and develop more partners; NGO’s, government Ministry and community-based organizations. • Resource mobilization – to augment Network’s income. • Celebrate children’s day, ASNN day, disability day and other special celebration related to children and disability. • Establish and develop CBR focal point (2012-2015)

  6. Special clinic project Target: • Public advocacy on disability prevention and causes, and child management • Improve accessibility in health services and equipping assistive devices in clinics • Strengthening the capacity of the health/clinic staff • Monitoring and evaluation

  7. THANK YOU Thank you

More Related