190 likes | 339 Views
CAAC ADS-B Implementation Introduction. Air Traffic Regulation Office (ATRO) April.2012. Contents. 1.CAAC ADS-B Implementation Preliminary Work 2.CAAC Next Phase Work 3. “ADS-B General Plan and Implementation of CAAC” release schedules.
E N D
CAAC ADS-B Implementation Introduction Air Traffic Regulation Office (ATRO) April.2012
Contents 1.CAAC ADS-B Implementation Preliminary Work 2.CAAC Next Phase Work 3. “ADS-B General Plan and Implementation of CAAC” release schedules
Preliminary Work — Policy, Specification and Standards • 2010,CAAC ATRO Published CAAC Surveillance Technology Implementation Policy (AC-115-TM-2010-01),IncludesADS-B Application Strategy. • 2011,CAAC ATRO and ATMB Published ADS-B ATC Operation Specification (AC-93-TM-2011-01) • 2012,CAAC ATRO finished ADS-B 1090MHz ES Ground Station(Receive) Technology Specification
Preliminary Work — Policy, Specification and Standards • 2008,CAAC Flight Standards DepartmentPublished ADS-B Flight Operation(IB-FS-2008-002 ) • 2010,CAAC Aircraft Airworthiness and Flight Standards Department PublishedAirworthiness and Operational Approval of ADS-B Application in non-radar areas via 1090MHz ES(AC-91-FS/AA-2010-14)
Preliminary Work — Policy, Specification and Standards • 2010, CAAC Aircraft Airworthiness Published ADS-B and TIS-B Airborne Equipment Standards (CTSO-C166b) • 2011, ATMB Began to Preparation of ADS-B Implementation Road Map.
Preliminary Work — ADS-B Equipment Certification Feb.2012,CAAC ATRO Authorize TEDC.CO.LTD ADS-B Ground StationLisence
Preliminary Work — ADS-B Route Surveillance Verification Oct.2009,ATMBChengDu—JiuZhai Route Archive to ADS-B surveillance coverage, including 2 ADS-B Ground Station.
Preliminary Work — ADS-B Application and Trail Operation May, 2011, ChengDu—LaSha Route ADS-Bbegan Trail Operation,including 6 Ground Station.
Preliminary Work — ADS-B Route Surveillance Application July.2011,Z1 route archive to ADS-B aurveillance coverage, ATMB is in charge of ADS-B trail operation, CAACSRI responsble for the whole project build.The project includes six ADS-B ground station
Preliminary Work — ADS-B Application Seminar Aug.2011,ADS-B Application Seminar held in ChengDu CAAC decides on ADS-B data link: Transport Aviation: 1090MHz ES data link General Aviation:1090MHz ES data link
Contents 1.CAAC ADS-B Implementation Preliminary Work 2.CAAC Next Phase Work 3. “ADS-B General Plan and Implementation of CAAC” release schedules
CAAC ADS-B Next Phase Work • Preparation of CAAC ADS-B Overall Planning and implementation of program • Standards, specifications and supporting polices of ADS-B application formulation and amendment. • ADS-B application problem research, includes: • ADS-B anti-spoof and jamming studying • ADS-B signal mixed fruit studying • Compass2 integrity impacts on ADS-B • Data Fusion of ads-b and other surveillance source
CAAC ADS-B Next Phase Work • Launch a series of ADS-B technology and function application verification projects, such as: • air-air surveillance application based on ADS-B IN function. includes Commercial and General Aviation • ADS-B ground station TIS-B/FIS-B function application verification. • ADS-B airborne equipment application verification based on GNSS(GPS + Compass2)
Contents 1.CAAC ADS-B Implementation Preliminary Work 2.CAAC Next Phase Work 3. “ADS-B General Plan and Implementation of CAAC” release schedules
CAAC ADS-B Implement Office & Work Group Feb.2012,CAAC ADS-B implement office & workgroup established. The Organization includes members of unit: CAAC Flight Standards Department CAAC Aircraft Airworthiness CAAC Air Traffic Regulation Office (ATRO) CAAC Air Traffic Management Bureau (ATMB) The Second Research Institute of CAAC(CAACSRI)
ADS-B Implementation Task Division of CAAC department • ATRO and CAACSRI responsible for preparation of “ADS-B General Plan and implementation solution of CAAC” • CAAC Flight Standards Department responsible for formulating airborne equipment updating planand flight crew training • CAAC Aircraft Airworthiness and Flight Standards Department responsible for ADS-B airborne equipment airworthiness certification
Task Division of CAAC department in ADS-B implement • ATROresponsible for the promulgation of the ADS-B ground station standard and ADS-B ground station equipment certification • ATMB excutes CAAC ADS-B implement program and responsible for preparation of the specification of ATC operation, equipment operation and staff training.
Release Schedules • May.2012 Complement the draft of “ADS-B General Plan and Implementation Solution of CAAC”. • June.2012 Submit to the ADS-B Implement office the comments edition of “ADS-B General Plan and Implementation Solution of CAAC”. • July.2012 CAAC authority release official version.