SVD on-call shift summary May12-19,2005

SVD on-call shift summary May12-19,2005. A.Kibayashi, H.Ishino. Troubles. 5/17 ( Run didn't start due to; 19:41:42 ERROR from [MASTER] SVD does not respond, please contact on-call shift J SVD "online" by Exp. shift (Schuemann-san) -> OK 5/18 ( After local run;

marie
Download Presentation

SVD on-call shift summary May12-19,2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SVD on-call shift summaryMay12-19,2005 A.Kibayashi, H.Ishino

  2. Troubles • 5/17 ( • Run didn't start due to; 19:41:42 ERROR from [MASTER] SVD does not respond, please contact on-call shift JSVD "online" by Exp. shift (Schuemann-san) -> OK • 5/18 ( • After local run; 10:19:38 ERROR from [SVD] Ping lost for PC9. Try "reset" a few times. -> didn't work. JReboot PC09. -> OK error messages : http://belle.kek.jp/group/svd/ushiroda/svd/daq/elist.html

  3. Fatal Errors • Event # inconsistent: SP13x5 • PPCI card null read: SP14, SP15 • TIMEOUT: PC15, PC16

  4. Radiation Dose Total dose 394.2 kRad Week dose 5.6 kRad you can get figure from http://belle.kek.jp/~tajimao/public/background/shift.gif

  5. Local Run Noise: H16 st~250, H131 st~420 unstable gain: H82 between C0&1, H125 C1&2, unstable <0505122105> w/ beam TotNoise H26(reported by the prev. shifter) looks OK quiet Noise H173 st~130 up Gain H11&19 between C1&2 down <0505131038> w/ beam TotNoise H16 st~250 up Noise H16 same as above Gain H11&19 between C1&2 still down H82 between c0&1 recovered, H195 st~160 down <0505141214> w/ beam TotNoise H16 normal, H45 slightly higher Noise same as above Gain H82 between C0&1 down, H125 between C1&2 down

  6. Local Run - cont'd <0505151004> w/beam TotNoise H16 noisy again, H130 st~420 up, 131st~30 up Noise same as above Gain H82&H125 same as yesterday <0505161602> w/ beam TotNoise H16, H130, H131 normal, H104 st~250 quieter Noise H16, H130, H131 normal, H45 st~260 20->30 Gain H16 st~350 70->50, H82 between C0&1 back to full gain H158 st~290 0->25, H179 between C1&2 down to 1/2 L1.5TotNoise H146, 147, 206, 207 local run slightly lower than the last run Leak Current H26,27 (reported by prev. shifter) stable

  7. QAM • QAM-Beam vertex (r-phi) resol at SVD for Bhabhas. history (run400+) of this peak: Run516 - at~0.015 Run467 - at -0.0075 Run466 - at -0.0075 (smaller than of Run467) Run423 - at -0.01 Run408 - at -0.019 Run406 - at -0.006 Run405 - at +0.001 (higher than the main peak!) Run402&401 - wider

  8. QAM - cont'd