50 likes | 186 Views
SVD on-call shift summar June2-9,2005. A.Kibayashi, H.Ishino. Troubles 2 (. 6/3 06:45 4PCs(0,8,9,10) rebooted J 23:15 After automatic tape change, "unexpected termination of HD in SVD local side" after SVD RESTART and start new run, "Error occured at PC 12: TIMEOUT error ID 1"
E N D
SVD on-call shift summarJune2-9,2005 A.Kibayashi, H.Ishino
Troubles 2 ( • 6/3 • 06:45 4PCs(0,8,9,10) rebooted J • 23:15 After automatic tape change, "unexpected termination of HD in SVD local side" after SVD RESTART and start new run, "Error occured at PC 12: TIMEOUT error ID 1" SVD state at UNDEF UNDEF => reboot PC12 => J error messages : http://belle.kek.jp/group/svd/ushiroda/svd/daq/elist.html
Radiation Dose Total dose 411.4 kRad Week dose 5.5 kRad you can get figure from http://belle.kek.jp/~tajimao/public/background/shift.gif
Local Run <0506031004> Tot. Noise, Noise H20 st~250 up, H40 between C2&3 up Gain H11-19-35-51 C1&2 down, H27 C0 recovered <0506042103> Gain H11 between C1&2 recovered, H27 C0 recovered <0506051005> Tot. Noise, Noise H20 st~250 90->100, H40 between C2&3 st~390 down H132 st~390 up, H95 st~310 30->40 Gain H82 between C0&1 recovered <0506061040> Tot. Noise, Noise H20 down, H40 upH 132 down Gain H130 st~420 recovered, H195 st~160 30->10 <0506071316> Tot. Noise, Noise H20, H40 down, H173 st~130 22->34 Gain H125 between C1&2 recovered H130 st~420 down H195 st~160 up, H208 st~470 down <0506080951> tot. Noise, Noise H45 st~250 down, H40 st~370 60->75 Noise H97 st~150 down, H105 st~60 10->15 Gain H82 between C0-1
Other Comments • [L1.5] pednoi0506052118.ps H146, H207, H166. H206 noise black lower than green • [others] - temperature/humidity at B4 24.6-7deg. 48-52% - no condensation found on the cooling pipe